Project Description
The project aimed at developing a Master Plan for the phased development of the Port Said Dafabet casino bonus codes, Wastewater and Storm Dafabet casino bonus codes disposal facilities from 1977 through the year 2000.
The Master Plan covered domestic, industrial and irrigation Dafabet casino bonus codes supply needs of the served areas as well as the wastewater facilities needs up to the year 2000. The study also included the development of high priority projects to be implemented immediately as remedial measures to improve the present conditions in areas not adequately served by the existing systems.
Energy conservation was considered from the very beginning. The energy losses were limited to the minimum by insulating building facades, glazing, walls, roofs and floors. Solar gains were managed taking into account sun trajectory in winter and summer, building orientation and shading.
Activities
- Civil Works
Scope
- Master plan
- Studies
Client
Ministry of Housing and Reconstruction
LOCATION
Dafabet casino bonus codes
,port-said
,project sheet
share this project