Project Description
Demolition of 5 dafabet casino and a pumping station in Old Salwa Reservoir Pumping Station and replacement with a new pumping station (115,776 m3/day), underground dafabet casino (30 MIG), and an office building to accommodate KAHRAMAA staff along with providing an office space for commercial investment.
Potable Water Pipelines
- dafabet casino 1 and 2: 295 m, 600 mm dia. DI pipeline
- Distillate Inlet: 561 m, 900 dafabet casino. DI pipeline
- Header Pipes: 78 m, 1200 dafabet casino. DI pipeline
Water Outlet Capacity
- Two dafabet casino: RM1 and RM2
- Two Duty Mains: 335 l/s pumps per rising main
- Total Flow Rate: 1,340 l/s
Activities
- Architectural
- Civil Works
- Mechanical
- MEP
- Structural
Scope
- Construction supervision
- Design review
Client
Leighton Contracting – HLG
LOCATION
qatar
,project sheet