dafabet Description
The governments of dafabet and Malawi have observed that delays in crossing the border, cargo clearance, and movement of passengers create barriers to trade in the region. Such delays, which account for the congestions at the Songwe-Kasumulu border crossing, also raise the cost of transportation of goods, which in turn affects the economy of both countries. The governments of dafabet and Malawi have thus reached an agreement to build aOne-Stop Border Post (OSBP) on their common border at the Songwe-Kasumulu crossing.
In collaboration with dafabet, the Tanzania Buildings Agency (TBA) will provide consultancy services for the intended OSBP construction and improvement.The timeframe for the execution of this project will be 36
months on two phases.
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- Infrastructure
- Interior Design
- Landscaping
- Mechanical
- Roads
- Structural
Scope
- Cadastral and topographic surveys
- Conceptual design
- Construction supervision
- Custom data modeling
- Design development
- Detailed design
- Environmental impact assessment
- Feasibility study
- Geotechnical investigations
- Schematic design
- Social impact assessment
- Tender documents
- Traffic impact study
Client
dafabet National Roads Agency
LOCATION
dafabet
,dafabet sheet
share this dafabet