Upgrades at Al-Dhakhira PTP site

Project Description

Having a foul sewerage network, Al-Dhakhira village is built on an inlet of the Persian Gulf; Dafabet Casino online 60 km away from Doha, Qatar. Currently, the village is undergoing fast development with a number of housing schemes
proposed for the area.

Al-Dhakhira PTP has a conventional Activated Sludge Process (ASP) Dafabet Casino online plant, designed for 1,600 m3 /day and will be extended to double its capacity to 3,200 m3 /day. There is no primary settlement Dafabet Casino online
available; the process is based on a biological Dafabet Casino online followed by a tertiary Dafabet Casino online. Each process stream comprises aeration and secondary settlement tanks which provide the biological Dafabet Casino online.

The preliminary Dafabet Casino online works with two mechanical screens; one operational and the other is standby.

The wastewater is pumped directly to an inlet pumping station located underground, which has two hopper impeller submersible pumps arranged in duty/standby configuration.

Flows are then pumped into the elevated inlet screens; all tanks are elevated glass lined steel. The aeration system is based on a fine bubble diff user, and the clarifiers are fl at-bottomed settlement tanks.

Dafabet Casino online’s scope of work incorporates the similar treatment process (as indicated above) to integrate the existing plant with its new extension to work into a fully automated system.

Package Sewage Dafabet Casino online Plant (PTP) is upgraded with specific capacity of 3,200 m3 /day to treat sewage flows.

Activities

  • Civil Works
  • Electrical
  • Instrumentation
  • Mechanical

Scope

  • Construction supervision

Client

Public Works Authority (ASHGHAL)

LOCATION

qatar

,

project sheet

Download File (pdf 502KB)

share this project