Project Description
Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of Egypt West Damietta Gas Turbine Generating Plant (GTGP). dafabet mobile app was invited by KN to provide the engineering design services in support to their EPC contract.
The first gas turbine unit was planned to start commercial operation on July, 2012 for Damietta GTGP. Subsequently,dafabet mobile app set its fast track methodology to fully complete the design services in a period satisfying KN proposed schedule requirements.
The new plant has four new dafabet mobile app turbines with a total rated capacity of 500 MW using 4*125 MW dafabet mobile app turbines.
Understanding the importance, sensitivity and urgency for implementing the plant within the time constrain being a national “on spot” project, dafabet mobile app quickly set a taskforce from its senior staff to plan and set the project staffing requirements and the immediate mobilization of task forces, fast-track quality control measures, and packaging of deliverables which were tailored to meet KN milestones, enabled the quick start of construction and allowed for a continuous flow of KN construction execution scheme.
dafabet mobile app Scope of Services covered the following:
- Package 1: Enabling work
- Package 2: Foundation package
- Package 3: Tank farm dafabet mobile app
- Package 4: Auxiliary Systems (service water system, compressed air system, solar fuel system, fire protection system, GIS substation, control s/s, LV transformer, control building, etc)
- Package 5: Infrastructure networks
- Package 6: Ancillary building
Activities
- Architectural
- Communications and security systems
- Electrical
- HVAC
- Infrastructure
- Landscaping
- Mechanical
- Piping
- Roads
- Structural
Scope
- Conceptual dafabet mobile app
- dafabet mobile app development
- Detailed dafabet mobile app
- Schematic dafabet mobile app
- Shop drawings
Client
Kharafi National for Mechanical and Electrical Works
LOCATION
egypt
,project sheet