Industrial, Oil and Gas Archives - ECG website /sector/industrial-oil-and-gas/ Just another WordPress site Sun, 28 Jul 2024 09:17:35 +0000 en-US hourly 1 Al-Sharkeya Sugar Factory /project/al-sharkeya-sugar-factory/ Sun, 28 Jul 2024 09:17:35 +0000 /?post_type=project&p=14552 Al-Sharkeya Sugar Manufacturing (ASSM) is established to address the expanding and unfulfilled demand for quality white sugar in Egypt and the MENA Region. ASSM is a green field project, building Egypt’s first state-of-the-art of sugar production facility in the Governorate of Al-Sharkeya, with a total investment cost of EGP 6 Billion. It was necessary for … Continued

The post Al-Sharkeya Sugar Factory appeared first on ECG website.

]]>
Al-Sharkeya Sugar Manufacturing (ASSM) is established to address the expanding and unfulfilled demand for quality white sugar in Egypt and the MENA Region. ASSM is a green field project, building Egypt’s first state-of-the-art of sugar production facility in the Governorate of Al-Sharkeya, with a total investment cost of EGP 6 Billion.
It was necessary for the company to expand the two warehouses to accommodate more storage space for the sugar, in addition to the construction of new warehouses to be used as an additional storage for finished products accommodating around (60) thousand tons of white sugar. They also may be used to accommodate around (25) thousand tons of raw sugar.

The post Al-Sharkeya Sugar Factory appeared first on ECG website.

]]>
Al-Wukair Logistics Park – Phases 1 & 2 /project/al-wukair-logistics-park-phases-1-2/ Tue, 09 Jul 2024 09:32:59 +0000 /?post_type=project&p=14481 Occupying a site total area of 1,482,909 m2 on Hamad Port Road expressway; the project includes a dry-ventilated warehouse, air-conditioned warehouse, showroom, CCTV building, guardroom, and services (substations and MEP services). The scope of work includes issuing construction documents for Phase 1, and tender documents for Phase 2, in addition to obtaining authorities approvals for … Continued

The post Al-Wukair Logistics Park – Phases 1 & 2 appeared first on ECG website.

]]>
Occupying a site total area of 1,482,909 m2 on Hamad Port Road expressway; the project includes a dry-ventilated warehouse, air-conditioned warehouse, showroom, CCTV building, guardroom, and services (substations and MEP services). The scope of work includes issuing construction documents for Phase 1, and tender documents for Phase 2, in addition to obtaining authorities approvals for both phases.

The post Al-Wukair Logistics Park – Phases 1 & 2 appeared first on ECG website.

]]>
Yanbu Grain Silos /project/yanbu-grain-silos/ Sun, 02 Jun 2024 14:03:13 +0000 /?post_type=project&p=14434 Located at Yanbu Commercial Port on the Eastern Coast of the Red Sea; the project consists of two reinforced concrete wheat storage silos, each with a capacity of 60,000 tons. ECG scope of works cover the preparation of detailed engineering and construction drawings, as well as the construction, testing, and commissioning of the silos and … Continued

The post Yanbu Grain Silos appeared first on ECG website.

]]>
Located at Yanbu Commercial Port on the Eastern Coast of the Red Sea; the project consists of two reinforced concrete wheat storage silos, each with a capacity of 60,000 tons. ECG scope of works cover the preparation of detailed engineering and construction drawings, as well as the construction, testing, and commissioning of the silos and their supporting facilities on turnkey basis.

The post Yanbu Grain Silos appeared first on ECG website.

]]>
Expansion of the Suez Canal Container Terminal in Port Said /project/expansion-of-the-suez-canal-container-terminal-in-port-said/ Sun, 12 Nov 2023 11:51:25 +0000 /?post_type=project&p=10282 Extension of the current container terminal with overall berth length of 955m long and by 500m depth of yard. The two-stage extension includes 12 ship-to-shore cranes and accommodates approximately 8K ground slots and 800 reefer plugs. Stage 1 encompasses eight ship-to-shore cranes, while Stage 2 includes four. Container handling from quay to yard is done … Continued

The post Expansion of the Suez Canal Container Terminal in Port Said appeared first on ECG website.

]]>
Extension of the current container terminal with overall berth length of 955m long and by 500m depth of yard. The two-stage extension includes 12 ship-to-shore cranes and accommodates approximately 8K ground slots and 800 reefer plugs. Stage 1 encompasses eight ship-to-shore cranes, while Stage 2 includes four. Container handling from quay to yard is done through terminal tractor-trailers and within the yard through electrical rubber-tyred gantry cranes (E-RTG) supplemented with empty handlers in addition to a number of reach stackers. There is also an adjacent intermodal yard might be used for rail-based operations. Other facilities include a gate complex, workshop, maintenance, administration building, control and security buildings, customs, and inspection areas etc.

The post Expansion of the Suez Canal Container Terminal in Port Said appeared first on ECG website.

]]>
Suez Methanol Derivatives Project /project/suez-methanol-derivatives-project/ Tue, 29 Aug 2023 12:19:18 +0000 /?post_type=project&p=10016 The complex stretches over a plot area of approximately 45,000 m2 and comprises three main processing plants as follows: Formaldehyde and Formalin, Urea Formaldehyde Resins (UFR) and Sulphonated Naphthalene Formaldehyde (SNF) Plants. This adds to raw material storage warehouses and tanks, finished product tanks, and utilities plants (compressed air, nitrogen, acids and caustic soda, process … Continued

The post Suez Methanol Derivatives Project appeared first on ECG website.

]]>
The complex stretches over a plot area of approximately 45,000 m2 and comprises three main processing plants as follows: Formaldehyde and Formalin, Urea Formaldehyde Resins (UFR) and Sulphonated Naphthalene Formaldehyde (SNF) Plants. This adds to raw material storage warehouses and tanks, finished product tanks, and utilities plants (compressed air, nitrogen, acids and caustic soda, process water, chilled water, natural gas and electric power supply).

The process know-how and concept for the SNF and UFR plants is provided by ZAVKOM and for the Formaldehyde and Formalin Plant by Johnson Matthey.

The post Suez Methanol Derivatives Project appeared first on ECG website.

]]>
Extension and Upgrade of Ghabbour Factory in Al-Sadat City /project/extension-and-upgrade-of-ghabbour-factory-in-al-sadat-city/ Wed, 21 Dec 2022 10:45:51 +0000 /?post_type=project&p=9543 The project includes the construction of a new paint shop building with footprint area of 10,400 m2, new chemical storage building with footprint area of 400 m2, and new fueling station (Gasoline and Diesel). In addition, several upgrades and extensions are made to the existing buildings; including the warehouse (footprint area of 10,480 m2), unboxing … Continued

The post Extension and Upgrade of Ghabbour Factory in Al-Sadat City appeared first on ECG website.

]]>
The project includes the construction of a new paint shop building with footprint area of 10,400 m2, new chemical storage building with footprint area of 400 m2, and new fueling station (Gasoline and Diesel).

In addition, several upgrades and extensions are made to the existing buildings; including the warehouse (footprint area of 10,480 m2), unboxing building (footprint area of 1,618 m2), body shop building (footprint area of 6,688 m2), assembly shop (footprint area of 8,400 m2), test shop (footprint area of 2,700 m2), and the administrative building (footprint area of 890 m2).

The post Extension and Upgrade of Ghabbour Factory in Al-Sadat City appeared first on ECG website.

]]>
Logistics and Transfer Warehouses in Subhan /project/logistics-and-transfer-warehouses-in-subhan/ Sun, 06 Nov 2022 08:33:57 +0000 /?post_type=project&p=9252 This project encompasses the design and construction of two pre-engineered metal building systems, consisting of a large open area for warehouse/storage operations and multiple separated smaller administrative office locations inside the building. The large warehouse building is approximately 156 x 61 meters (BUA: 9,920 m2) and the transfer warehouse is 100 x 30 meters (BUA: … Continued

The post Logistics and Transfer Warehouses in Subhan appeared first on ECG website.

]]>
This project encompasses the design and construction of two pre-engineered metal building systems, consisting of a large open area for warehouse/storage operations and multiple separated smaller administrative office locations inside the building. The large warehouse building is approximately 156 x 61 meters (BUA: 9,920 m2) and the transfer warehouse is 100 x 30 meters (BUA: 3,125 m2). Both facilities areas require HVAC, power, fire protection and life safety provisions, communication (data & telephone), and utilities.

The project also includes two pump shed steel structures each with a BUA of 32 m2 and two R.C sewage tanks each with a BUA of 30 m2.

The post Logistics and Transfer Warehouses in Subhan appeared first on ECG website.

]]>
Paper Factory for Al-Hussein International Company /project/paper-factory-for-al-hussein-international-company/ Thu, 13 Oct 2022 10:01:24 +0000 /?post_type=project&p=9157 Located in 6th of October Industrial Zone, the project stretches over a total plot area of around 19,899 m2 and includes steel structure buildings with a total built-up area of about 17,093 m2. The project comprises: Administration area: 4 floors with a total BUA of 4,144 m2 Production area: ground floor with a total BUA … Continued

The post Paper Factory for Al-Hussein International Company appeared first on ECG website.

]]>
Located in 6th of October Industrial Zone, the project stretches over a total plot area of around 19,899 m2 and includes steel structure buildings with a total built-up area of about 17,093 m2.

The project comprises:

  • Administration area: 4 floors with a total BUA of 4,144 m2
  • Production area: ground floor with a total BUA of 6,533 m2
  • Service rooms: ground and mezzanine floors with a total BUA of 2,064 m2
  • Pallet Store: ground floor with a total BUA of 1,920 m2
  • Roll Store: ground floor with a total BUA of 2,432 m2

The post Paper Factory for Al-Hussein International Company appeared first on ECG website.

]]>
Extension of Vinavil Egypt Plant /project/extension-of-vinavil-egypt-plant/ Tue, 19 Jul 2022 13:23:51 +0000 /?post_type=project&p=8799 Over a land strip with road front of 50 m and area of about 50 m x 110 m, and with a total built-up area of 1,650 m2; the extension comprises a production area, new cooling tower, finished products tanks, and external tank farm with a total number of 15 tanks and vessels (2 with … Continued

The post Extension of Vinavil Egypt Plant appeared first on ECG website.

]]>
Over a land strip with road front of 50 m and area of about 50 m x 110 m, and with a total built-up area of 1,650 m2; the extension comprises a production area, new cooling tower, finished products tanks, and external tank farm with a total number of 15 tanks and vessels (2 with storage capacity of 1,000 m3, 2 with storage capacity of 150 m3, 3 with storage capacity of 90 m3 , 2 with storage capacity of 160 m3, 1 with storage capacity of 60 m3, 2 with storage capacity of 50 m3, 1 with storage capacity of 6 m3 , 1 with storage capacity of 4 m3  and 1 with storage capacity of 2.4 m3).

Scope of works covers piping and instrumentation diagrams, process piping systems, instrument list, instrument loop diagrams, instrument cable schedule, MTO, instrument wiring diagrams, control room layout, firefighting and F&G detection systems, in addition to dike walls, pipe rack, and utility expansion.

The post Extension of Vinavil Egypt Plant appeared first on ECG website.

]]>
Industrial Complex for The National Company for Advanced Industries and Integrated Strategic Printing Solutions “NASPS” /project/industrial-complex-for-the-national-company-for-advanced-industries-and-integrated-strategic-printing-solutions-nasps/ Sun, 29 May 2022 11:41:06 +0000 /?post_type=project&p=8685 Stretching on a total land area of 424,200 m2 (101 acres), the project is an industrial complex on Cairo – Al-Ain Al-Sokhna Road; consisting of 21 blocks. The complex encompasses an administrative building, factory buildings & storages, application center, in addition to other service facilities including the main service buildings (power station, sewage lift station, … Continued

The post Industrial Complex for The National Company for Advanced Industries and Integrated Strategic Printing Solutions “NASPS” appeared first on ECG website.

]]>
Stretching on a total land area of 424,200 m2 (101 acres), the project is an industrial complex on Cairo – Al-Ain Al-Sokhna Road; consisting of 21 blocks.

The complex encompasses an administrative building, factory buildings & storages, application center, in addition to other service facilities including the main service buildings (power station, sewage lift station, water and storm tanks, potable water pump room, and garbage room). This adds to an auto transport facility which contains an inspection building and car sheds.

All buildings and facilities are secured by security buildings and towers and monitored by a control room.

The post Industrial Complex for The National Company for Advanced Industries and Integrated Strategic Printing Solutions “NASPS” appeared first on ECG website.

]]>
Ghabbour Service Area in Assiut /project/ghabbour-service-area-in-assiut/ Tue, 18 Jan 2022 08:36:45 +0000 /?post_type=project&p=8314 On a total land area of 12,230 m2; the project comprises car services building (G+1) with a BUA of 3,982 m2, bus services building (ground level) with a BUA of 1,828 m2, substation building (ground level) with a BUA of 122 m2, guard house with a BUA of 18 m2, and gates & fences. This … Continued

The post Ghabbour Service Area in Assiut appeared first on ECG website.

]]>
On a total land area of 12,230 m2; the project comprises car services building (G+1) with a BUA of 3,982 m2, bus services building (ground level) with a BUA of 1,828 m2, substation building (ground level) with a BUA of 122 m2, guard house with a BUA of 18 m2, and gates & fences. This adds to external works which include infrastructure and internal roads networks.

The post Ghabbour Service Area in Assiut appeared first on ECG website.

]]>
APEX Pharma Factory /project/apex-pharma-factory/ Tue, 10 Dec 2019 12:13:44 +0000 https://ecgsa.com/?project=apex-pharma-factory Located in King Abdullah Economic City, on a total area of 49,960 m2, the project is a state-of-the-art pharmaceutical production facility comprising a ground and first floors, designed and constructed over two phases: Phase 1: with a built up area of 15,300 m2, comprises solid dosage forms and commercial batches production areas, a pilot area … Continued

The post APEX Pharma Factory appeared first on ECG website.

]]>
Located in King Abdullah Economic City, on a total area of 49,960 m2, the project is a state-of-the-art pharmaceutical production facility comprising a ground and first floors, designed and constructed over two phases:

Phase 1: with a built up area of 15,300 m2, comprises solid dosage forms and commercial batches production areas, a pilot area for manufacturing process development; and the Research and Development Department.

Phase 2: with a built up area of 8,500 m2, is reserved for the manufacturing of other dosage forms.

The post APEX Pharma Factory appeared first on ECG website.

]]>
Al-Galala Resort District Cooling Plant /project/al-galala-resort-district-cooling-plant/ Tue, 10 Dec 2019 12:13:37 +0000 https://ecgsa.com/?project=al-galala-resort-district-cooling-plant This project was undertaken by a consortium comprising ECG Engineering Consultants Group, Misr Engineering Development Company (MEDCOM), and ECM Energy Services.The district cooling plant consists of a ground floor and a mezzanine, with a total built-up area of about 3,500 m2.The plant, operated using chilled water, has a total cooling capacity of 16,866 kW (4,800 … Continued

The post Al-Galala Resort District Cooling Plant appeared first on ECG website.

]]>
This project was undertaken by a consortium comprising ECG Engineering Consultants Group, Misr Engineering Development Company (MEDCOM), and ECM Energy Services.
The district cooling plant consists of a ground floor and a mezzanine, with a total built-up area of about 3,500 m2.
The plant, operated using chilled water, has a total cooling capacity of 16,866 kW (4,800 TR).
It includes the following components:

  • double-height chiller yard complete with chillers, pumps, piping, and connections
  • administration area that includes offices, meeting room, toilets, storage area, and other services
  • electrical rooms with low-voltage and medium-voltage generators

The plant has four centrifugal, water-cooled, parallel counterflow chillers, as well as HFC-134a refrigerants. The chillers utilize the vapor-compression cycle, and each chiller has a capacity of 2 × 5,622 kW (2 × 1,600 TR) at a
constant speed, and a capacity of 2 × 2,811 kW (2 × 800 TR) at a variable speed.
District Cooling System

  • Chilled water design temperature: 8.9 C°
  • Chilled water supply/return: 4.4 C/13.3 C° Pumping
  • Primary chilled water pumps: 4
  • Secondary pumps: 4

Drive: variable speed

  • Condensation pumps: 4
  • Pump type: horizontal split case Cooling Towers
  • Position: atop the plant
  • Cooling towers: 4
  • Cells per cooling tower: two towers have two cells each, and two towers have one cell each
  • Cooling tower temperature: 5.6 C°
  • Cooling tower design temperature (in/out): 35.0 C°/29.4 C°

The post Al-Galala Resort District Cooling Plant appeared first on ECG website.

]]>
Electronics Factory in New Assiut City, Egypt /project/electronics-factory-in-new-assiut-city-egypt/ Tue, 10 Dec 2019 12:09:18 +0000 https://ecgsa.com/?project=electronics-factory-in-new-assiut-city-egypt The factory building consists of a ground floor and three upper floors. The ground and first floors are planned to be fully finished & equipped. The second and third floors are core & shell and set aside for future expansion. The project also covers a power plant adjacent to the factory building.  

The post Electronics Factory in New Assiut City, Egypt appeared first on ECG website.

]]>
The factory building consists of a ground floor and three upper floors. The ground and first floors are planned to be fully finished & equipped. The second and third floors are core & shell and set aside for future expansion.

The project also covers a power plant adjacent to the factory building.

 

The post Electronics Factory in New Assiut City, Egypt appeared first on ECG website.

]]>
Renovation of Unilever Factory /project/renovation-of-unilever-factory/ Tue, 10 Dec 2019 12:08:18 +0000 https://ecgsa.com/?project=renovation-of-unilever-factory With a footprint area of 5,412 m2 and a total built-up area of 13,500 m2, the factory of Unilever Mashreq is located at Industrial Zone 4 in 6th of October City.The project covered the renovation and refurbishment of the Powder Factory (steel structure), which comprises the following buildings: Sprays Tower (for powder drying) Process Building … Continued

The post Renovation of Unilever Factory appeared first on ECG website.

]]>
With a footprint area of 5,412 m2 and a total built-up area of 13,500 m2, the factory of Unilever Mashreq is located at Industrial Zone 4 in 6th of October City.
The project covered the renovation and refurbishment of the Powder Factory (steel structure), which comprises the following buildings:

  • Sprays Tower (for powder drying)
  • Process Building (production): ground floor and five upper floors
  • Packing Building: ground floor and mezzanine

The post Renovation of Unilever Factory appeared first on ECG website.

]]>
Halliburton Workshop /project/halliburton-workshop/ Tue, 10 Dec 2019 12:07:27 +0000 https://ecgsa.com/?project=halliburton-workshop Construction of Halliburton new workshop in Kattamya over a footprint area of 2,000m2. The workshop consists of mezzanine and ground floor housing storage facilities, offices, lockers, laboratories, and control room.

The post Halliburton Workshop appeared first on ECG website.

]]>
Construction of Halliburton new workshop in Kattamya over a footprint area of 2,000m2. The workshop consists of mezzanine and ground floor housing storage facilities, offices, lockers, laboratories, and control room.

The post Halliburton Workshop appeared first on ECG website.

]]>
Edita New Premises /project/edita-new-premises/ Tue, 10 Dec 2019 12:07:20 +0000 https://ecgsa.com/?project=edita-new-premises To increase its production capacity, Edita Food Industries Company decided to relocate its logistic hub to Sheikh Zayed City. The project site is served by a road network encompassing parking area accommodating 112 spaces for distribution vehicles, 95 spaces for passenger cars and10 spaces for trucks at the loading dock. The project is air-conditioned through … Continued

The post Edita New Premises appeared first on ECG website.

]]>
To increase its production capacity, Edita Food Industries Company decided to relocate its logistic hub to Sheikh Zayed City. The project site is served by a road network encompassing parking area accommodating 112 spaces for distribution vehicles, 95 spaces for passenger cars and
10 spaces for trucks at the loading dock.

The project is air-conditioned through a central Chilled Water Plant and it is electrically and structurally ready to receive chillers for future requirements.

The project land is 4.00m below the street level, the distribution trucks and vehicles use two huge ramps with width of 10.00m to reach the logistic hub using adequate internal roads. Private cars and passengers use a bridge to reach the main entrance of the Office building at both the ground floor and the basement as well as the indoor parking of the Office Building.

Over a land area of about 20,770m2, the project comprises 4 buildings:

Headquarters Office Building: with a footprint of about 2,400m2, the building includes all employee and top management offices. It is composed of basement, ground and three typical floors. The building design is based on a dividable open space-planning concept to suit office space requirements. The central area encompasses main staircase, toilets, janitors’ closet and other services. Natural lighting passes through the wide double glass windows.

Logistic Hub: with a footprint area of 2,730m2, the building comprises a ground floor and three typical
floors. The design is based on an open space theme to suit storing requirements and maximum capacity with the most flexible maneuvering. The building is designed to store all kinds of Edita products using special racks facilitating the in-out process of all products at any time.

Services Building: with a footprint of about 1,050m2, the building comprises a ground floor and two typical floors. It includes vehicles’ workshops to provide maintenance services for the company vehicles and spare parts storages. The building also includes cafeteria, praying area, distributors’ offices, workers’ lockers, etc. Power Station Building.

 

The post Edita New Premises appeared first on ECG website.

]]>
Warehouse Park, KAEC /project/warehouse-park-kaec/ Tue, 10 Dec 2019 12:07:18 +0000 https://ecgsa.com/?project=warehouse-park-kaec Spread over a total land area of approximately 30,433 m2, the Warehouse Park is located at Phase 1B of the Industrial Valley in King Abdullah Economic City, Saudi Arabia. Emaar, The Economic City (EEC) intends to develop 12 fully serviced shell warehouse buildings with a total builtup area of 12,540 m2, with a view to … Continued

The post Warehouse Park, KAEC appeared first on ECG website.

]]>
Spread over a total land area of approximately 30,433 m2, the Warehouse Park is located at Phase 1B of the Industrial Valley in King Abdullah Economic City, Saudi Arabia.

Emaar, The Economic City (EEC) intends to develop 12 fully serviced shell warehouse buildings with a total builtup area of 12,540 m2, with a view to creating a landmark of warehouse buildings. Each unit has a ground floor and mezzanine, with a total built-up area of 1,045 m2.

The warehouse units are intended for commercial activities relating to logistics, storage & distribution, light manufacturing, as well as assembly, and will be leased by EEC to individual tenants.

With a modular warehouse building design, the warehouse units will allow for flexible combinations in
terms of size and layout to serve the requirements of tenants with respect to the main functions of each
commercial activity

The post Warehouse Park, KAEC appeared first on ECG website.

]]>
Rosetta Sugar Refinery /project/rosetta-sugar-refinery/ Tue, 10 Dec 2019 11:58:08 +0000 https://ecgsa.com/?project=rosetta-sugar-refinery Cargill-Egypt decided to build a greenfield White Sugar Refinery in the fifth Industrial Zone in Borg Al- Arab, Egypt. ECG was awarded the contract to provide engineering consultancy services of preliminary design and detailed design. With land area of approximately 150,000m2 and a built-up area of 100,000m2, the plant comprises process building, white sugar warehouse, … Continued

The post Rosetta Sugar Refinery appeared first on ECG website.

]]>
Cargill-Egypt decided to build a greenfield White Sugar Refinery in the fifth Industrial Zone in Borg Al- Arab, Egypt. ECG was awarded the contract to provide engineering consultancy services of preliminary design and detailed design.

With land area of approximately 150,000m2 and a built-up area of 100,000m2, the plant comprises process building, white sugar warehouse, raw sugar warehouse, re-melt area, high voltage area and fire protection building; fence and ancillary buildings including maintenance building; administration building, mosque, canteen, guard house and weigh bridge house.The Plant has access to roads, water, natural gas and electricity networks.

The new Refinery produces Very High Polarity (VHP) white sugar from raw sugar. The plant’s nameplate reads operation capacity of 2,000 tons of melted VHP sugar/ day which is equal to 660,000 tons of raw sugar/year. The refinery’s capacity is designed to be easily expandable to 3,000 tons/day.

The post Rosetta Sugar Refinery appeared first on ECG website.

]]>
Delta Beet Sugar Co. Tie-in Lines /project/delta-beet-sugar-co-tie-in-lines/ Tue, 10 Dec 2019 11:58:04 +0000 https://ecgsa.com/?project=delta-beet-sugar-co-tie-in-lines Delta Sugar Co. (DSC) is the leading producer of beet sugar in Egypt providing more than 25% of the country’s sugar requirements. SIIC assigned ECG to perform the engineering services for the design of the tie-in lines between the different units with their supporting structure. The design includes a pipe bridge crossing 22 meters wide … Continued

The post Delta Beet Sugar Co. Tie-in Lines appeared first on ECG website.

]]>
Delta Sugar Co. (DSC) is the leading producer of beet sugar in Egypt providing more than 25% of the country’s sugar requirements. SIIC assigned ECG to perform the engineering services for the design of the tie-in lines between the different units with their supporting structure. The design includes a pipe bridge crossing 22 meters wide on the public road; encompassing tie-in lines with battery limits of different units, piping layout, pipe routing, pipe supports, isometrics, and piping stress analysis.

The post Delta Beet Sugar Co. Tie-in Lines appeared first on ECG website.

]]>