Power Archives - ECG website /sector/power/ Just another WordPress site Tue, 12 Nov 2024 14:27:41 +0000 en-US hourly 1 400 KV Al-Faw Substation and OHTL /project/400-kv-al-faw-substation-and-ohtl/ Wed, 31 Jul 2024 12:01:32 +0000 /?post_type=project&p=14566 The project (Al-Faw substation 400/132/11 KV) comprises the following: 1. 400 KV substation consisting of five bays of breaker-and-half configuration to make ten feeders; six for the overhead transmission lines and four for the 4 Auto-Transformers 400/132/11 KV, each with a capacity of 250 MVA (total capacity of 1,000 MVA). • Phase Power Transformer Model: … Continued

The post 400 KV Al-Faw Substation and OHTL appeared first on ECG website.

]]>
The project (Al-Faw substation 400/132/11 KV) comprises the following:
1. 400 KV substation consisting of five bays of breaker-and-half configuration to make ten feeders; six for the overhead transmission lines and four for the 4 Auto-Transformers 400/132/11 KV, each with a capacity of 250 MVA (total capacity of 1,000 MVA).
• Phase Power Transformer Model: TL 1950 C
• Year: 2014
• Standard: IEC 60076
• Type of Oil: Ergon Hyvolt I
• Rated Frequency: 50 Hz.
• Method of Cooling: ONAF
• Temp Rise of Oil Max: 50K
• Temp Rise of Average Winding: 55 K
• Ambient Temperature Max: 50 Degree
• Hot Spot: 68 K
• Vector Group Single Phase I A0 I0
• Vector group three phase YN A0 D11
2. Four Auxiliary Transformers 400 KVA-11/0.4 KV (Type: OCREV, Made in Italy, 1000 KVA, Frequency: 50 Hz., Year: 2019, Voltage: 11 / 0.4 KV, Vector Group: Dyn11)
• Equipment of the substation (400KV, 132 KV, G.I.B.) are of G.I.S. type
• Equipment brand type is GE “Alstom”
• Protection equipment brand type is “Micom” France

3. Electricity Project for the Gulf connection of the section in Iraq.
• It consists of two parts:
First Part:
o Extending, wiring, and installing 400 KV towers for a double line.
o It starts from Safwan area in Basrah and ends in Al-Faw 400 KV Substation in south of Basra next to the Arabian Gulf.
o The line (87 Km long) consists of 225 towers and only 27 tower foundations have been implemented so far.
o This line enhances the electrical capacity with 500 MW.

Second Part in Al-Faw 400KV Substation
o Installing two reactors and their accessories of CVT, CT, SA, GIB, as well as other systems of protection, control devices, and wiring AC, DC cables. The aim of installing reactors is to improve the power factor, as long power lines result in voltage increase which changes the power rates.

The post 400 KV Al-Faw Substation and OHTL appeared first on ECG website.

]]>
Al-Wafra Substation and Overhead Transmission Line (400 KV) /project/al-wafra-substation-and-overhead-transmission-line-400-kv/ Sun, 14 Jul 2024 11:31:25 +0000 /?post_type=project&p=14523 GCCIA executes 400 KV OHTL from Al-Fadli 400 KV substation in Saudi Arabia to Al-Faw 400 KV substation in Iraq through the execution of Al-Wafra 400 KV substation in Kuwait to transfer 500 MW in the first phase, with a total of 1,800 MW. The project includes the supply and installation of circuit breakers, electrical … Continued

The post Al-Wafra Substation and Overhead Transmission Line (400 KV) appeared first on ECG website.

]]>
GCCIA executes 400 KV OHTL from Al-Fadli 400 KV substation in Saudi Arabia to Al-Faw 400 KV substation in Iraq through the execution of Al-Wafra 400 KV substation in Kuwait to transfer 500 MW in the first phase, with a total of 1,800 MW.
The project includes the supply and installation of circuit breakers, electrical reactors, and measurement and control systems for the construction and expansion of substations in Al-Wafra and Al-Faw. This contributes to the supply of electricity to the Southern Region Electricity Network and supports the demand for electricity in Basra. It also lays the foundations for future exchange and trade of electric energy between the Gulf state and Iraq under the umbrella of the regional and Arab electricity market to ensure the sustainability of electric power.
Al-Wafra 400 KV Substation in Kuwait occupies a land of 280 m x 180 m. It consists of GIS building (130 m x 20 m), telecom and control buildings, security room and seven gantries to support electricity transaction from Saudi Arabia to Iraq. It also consists of a 400 KV OHTL rout with 15 km length through the first portion of 1/5, within 78 electrical steel towers to support two parallel lines (39 towers each) from Al-Wafra substation to Kuwait-Saudi border.
In addition, the 400 KV OHTL rout in Saudi Arabia passes through the second portion of 1/5 with 35 km length from Al-Fadli lines to Kuwait-Saudi border.
The project also includes renovation and upgrade of Al-Faw 400 KV substation in the South of Iraq. This includes a 400 KV OHTL rout that passes through the portion of 5/5 with 85 km length from Al-Faw station to Iraq-Kuwait border.

The post Al-Wafra Substation and Overhead Transmission Line (400 KV) appeared first on ECG website.

]]>
Beleza and Hirgigo Power Plants /project/beleza-and-hirgigo-power-plants/ Tue, 07 Nov 2023 12:57:39 +0000 /?post_type=project&p=10250 The Eritrean Electricity Corporation aims at improving the production capacity of two main stations in the inter-connected grid, namely Beleza and Hirgigo, which serves a number of major cities and surrounding rural areas. The company intends to produce 132 MW in addition to the current capacity of 151.1 MW through the erection of 3 engines … Continued

The post Beleza and Hirgigo Power Plants appeared first on ECG website.

]]>
The Eritrean Electricity Corporation aims at improving the production capacity of two main stations in the inter-connected grid, namely Beleza and Hirgigo, which serves a number of major cities and surrounding rural areas. The company intends to produce 132 MW in addition to the current capacity of 151.1 MW through the erection of 3 engines (8MW each) in Beleza power plant and rehabilitation of Hirgigo power plant.

Beleza Power Plant

ECG scope of works includes collecting, reviewing, analyzing and commenting on the tender package submitted by the Contractor. Erection of the new 3 engines include the following components:

  1. 3x 8 MW medium speed diesel generating sets with the associated mechanical and electrical equipment
  2. Site works including site layout, fence, gates, site grading, access roads, and landscape
  3. Tie-in with the existing fuel storage facility
  4. Tie-in with the existing firefighting facility
  5. Cooling water system
  6. Lube oil storage facility
  7. Control building
  8. Switch yard
  9. Water treatment system
  10. Transformers

Hirgigo Power Plant

ECG prepares a complete set of tender documents with the relevant drawings, data sheets and spare parts to ease the process of issuing an international tender for overhauling 4 generating sets and common facilities.

Works cover:

  1. Overhaul of four engines
  2. Rehabilitation of common facilities including compressors, boilers, desalination plant, and sea water pumps

ECG scope of work includes project management, and construction supervision, in addition to on-the-job training for qualified counterpart engineers and technicians.

The post Beleza and Hirgigo Power Plants appeared first on ECG website.

]]>
Global Hydrogen Diplomacy (H2-DIPLO) /project/global-hydrogen-diplomacy-h2-diplo/ Sun, 13 Aug 2023 13:00:42 +0000 /?post_type=project&p=9932 The study main objective is to provide an overview of the Saudi Arabia’s main energy export markets in the light of decarburization and green hydrogen production & use. In addition to the extent of cost competition in the export of Saudi hydrogen and its derivatives. The study investigates the following: The nature of hydrogen-based energy … Continued

The post Global Hydrogen Diplomacy (H2-DIPLO) appeared first on ECG website.

]]>
The study main objective is to provide an overview of the Saudi Arabia’s main energy export markets in the light of decarburization and green hydrogen production & use. In addition to the extent of cost competition in the export of Saudi hydrogen and its derivatives.

The study investigates the following:

  • The nature of hydrogen-based energy carriers and their suitability for specific applications.
  • The goals of greenhouse gas emission reduction and timelines of these off-taker markets and the measures to achieve them.
  • The role of hydrogen and PtX in these key markets and the extent to which they can substitute for oil and its derivatives.
  • The production and use of Saudi Arabian hydrogen can meet the demands in Asian and European countries.

The post Global Hydrogen Diplomacy (H2-DIPLO) appeared first on ECG website.

]]>
3014_NREA Wind Farm (250 MW) /project/3014_nrea-wind-farm-250-mw/ Tue, 24 Jan 2023 09:09:44 +0000 /?post_type=project&p=9598 Located at the occidental side of the Gulf of Suez, 30 km northwest of Ras Gharib and 7 km East of Jabal Gharib; the farm comprises 70 wind turbines.

The post 3014_NREA Wind Farm (250 MW) appeared first on ECG website.

]]>
Located at the occidental side of the Gulf of Suez, 30 km northwest of Ras Gharib and 7 km East of Jabal Gharib; the farm comprises 70 wind turbines.

The post 3014_NREA Wind Farm (250 MW) appeared first on ECG website.

]]>
Environmental and Social Impact Assessment (ESIA) for upgrading El-Shabab Power Plant /project/environmental-and-social-impact-assessment-esia-for-upgrading-el-shabab-power-plant/ Tue, 10 Dec 2019 12:05:35 +0000 https://ecgsa.com/?project=environmental-and-social-impact-assessment-esia-for-upgrading-el-shabab-power-plant On a total area of approximately 87,248 m2, Al-Shabab site is located at the north western of Ismailia governorate, about 79 km from Markaz At-Tall Al-Kabir at the north eastern of Cairo. The existing Al-Shabab gas turbine power plant has three Gas Turbine Generators (GTGs) (3×33.5 MW). The Egyptian Electricity Holding Company (EEHC) constructs and … Continued

The post Environmental and Social Impact Assessment (ESIA) for upgrading El-Shabab Power Plant appeared first on ECG website.

]]>
On a total area of approximately 87,248 m2, Al-Shabab site is located at the north western of Ismailia governorate, about 79 km from Markaz At-Tall Al-Kabir at the north eastern of Cairo. The existing Al-Shabab gas turbine power plant has three Gas Turbine Generators (GTGs) (3×33.5 MW).

The Egyptian Electricity Holding Company (EEHC) constructs and operates a new Combined Cycle power plant at the existing Al-Shabab gas turbines plant.

The power plant will start operation by the year 2016- 2017; the Combined Cycle Power Plant is 1500 MW, with  a nominal electricity generating capacity of 125 MW eight Heat Recovery Steam Generators (HRSGs) to produce enough steam in order to generate 2×250 MW using two identical steam turbines, which will be known as Al- Shabab combined Cycle Power Plant.

The power output from the proposed plant will be sold to the Egyptian Electricity Transmission Company (EETC). The new project aims to convert the existing simple cycle to a combined cycle plant, which reduces the gas turbines’ exhaust gas temperature.

The power plant utilizes both natural gas and solar; this “dual-fuel” operability provides security of electricity provision in the event that gas supplies are unavailable for any reason. In addition, a small emergency generator operating on solar will also be provided on-site to operate key equipment within the power plant in the event of power supply failure.

The Environmental and Social Impact Assessment (ESIA) report is prepared by ECG, based on many baseline studies undertaken by independent national and international consultants and on the information provided by EEHC, EDEPC and their sub-contractors.

The post Environmental and Social Impact Assessment (ESIA) for upgrading El-Shabab Power Plant appeared first on ECG website.

]]>
Attaqa & Mahmoudia Gas Turbine Power Plants /project/attaqa-mahmoudia-gas-turbine-power-plants/ Tue, 10 Dec 2019 12:05:32 +0000 https://ecgsa.com/?project=attaqa-mahmoudia-gas-turbine-power-plants Elsewedy Power System Projects (PSP), a subsidiary of Elsewedy Electric, was awarded an Engineering, Procurement, and Construction (EPC) contract for Attaqa & Mahmoudia Gas Turbine Power Plants. Understanding the urgency of implementing such a national high-priority project within the predetermined time constraint, ECG has rapidly set up a task force involving senior staff to plan … Continued

The post Attaqa & Mahmoudia Gas Turbine Power Plants appeared first on ECG website.

]]>
Elsewedy Power System Projects (PSP), a subsidiary of Elsewedy Electric, was awarded an Engineering, Procurement, and Construction (EPC) contract for Attaqa & Mahmoudia Gas Turbine Power Plants. Understanding the urgency of implementing such a national high-priority project within the predetermined time constraint, ECG has rapidly set up a task force involving senior staff to plan and meet the project’s staffing requirements and to immediately start the mobilization of personnel specifically appointed to meet the PSP milestones. This has enabled a quick start of construction, and has allowed for a timely execution of the PSP construction scheme.

The simple cycle power plant in Attaqa has 4 × SGT- 2000E Siemens Gas Turbines with a total rated capacity of approximately 650 MW. The simple cycle power plant in Mahmoudia has 2 × AE94.2 Ansaldo Gas Turbines with a total rated capacity of 330 MW.

The project also covers the installation of equipment and units such as transformers; GIS; gas-receiving system and networks; administrative and control buildings; as well as workshops and site utilities (compressed-air system, industrial wastewater system, sewage treatment system, tanks, demineralized water system, storm water drainage, and low-current systems).

The post Attaqa & Mahmoudia Gas Turbine Power Plants appeared first on ECG website.

]]>
Farafra Diesel Power Station /project/farafra-diesel-power-station/ Tue, 10 Dec 2019 12:05:26 +0000 https://ecgsa.com/?project=farafra-diesel-power-station The 4 × 4 MW diesel power station is located in Farafra Oasis near Farafra-Wahaat Highway. On a plot area of 62,500 m2, the project comprises the following buildings: Powerhouse building (footprint of 760 m2): ground floor (switchgear & main control center) and mezzanine (control room, battery room, offices, and toilets). Transformers building (footprint of … Continued

The post Farafra Diesel Power Station appeared first on ECG website.

]]>
The 4 × 4 MW diesel power station is located in Farafra Oasis near Farafra-Wahaat Highway. On a plot area of 62,500 m2, the project comprises the following buildings:

  • Powerhouse building (footprint of 760 m2): ground floor (switchgear & main control center) and mezzanine (control room, battery room, offices, and toilets).
  • Transformers building (footprint of 168 m2): four transformers surrounded by a chain-link enclosure with four separate chain-link gates; the transformers are separated by reinforced concrete firewalls, and the building is covered with corrugated steel sheets.
  • Auxiliary transformers building (footprint of 60 m2): two auxiliary transformers surrounded by a chain-link enclosure with two separate gates; the building is covered with corrugated steel sheets.
  • Workshop & storage building (footprint of 174 m2): enclosed workshop & store, as well as staff changing rooms with lockers and toilets.
  • Staff housing building (footprint of 250 m2): ground floor and three typical floors; each floor consists of two apartments, each with a living room, two bedrooms, a kitchen, and a bathroom
  • Guardhouse (footprint of 25 m2): office, bedroom, and toilet
  • Pump room, fire pump room, water treatment room, water tank, and valve room located adjacent to the tank farm
  • Open storage (1,000 m2) shaded with corrugated steel sheets
  • Perimeter fence (1,000 meters long) with four guard towers at the corners

The post Farafra Diesel Power Station appeared first on ECG website.

]]>
Environmental and Social Impact Assessment (ESIA) for Upgrading West Damietta Power Plant /project/environmental-and-social-impact-assessment-esia-for-upgrading-west-damietta-power-plant/ Tue, 10 Dec 2019 12:05:25 +0000 https://ecgsa.com/?project=environmental-and-social-impact-assessment-esia-for-upgrading-west-damietta-power-plant West Damietta site is located on the southern shoreline of the Mediterranean Sea, about 200 km from north Cairo along the railway which connects east Damietta to west of the site parallel to the International Coastal Highway. The Egyptian Electricity Holding Company (EEHC) constructs and operates a new Combined Cycle power plant at the existing … Continued

The post Environmental and Social Impact Assessment (ESIA) for Upgrading West Damietta Power Plant appeared first on ECG website.

]]>
West Damietta site is located on the southern shoreline of the Mediterranean Sea, about 200 km from north Cairo along the railway which connects east Damietta to west of the site parallel to the International Coastal Highway.

The Egyptian Electricity Holding Company (EEHC) constructs and operates a new Combined Cycle power plant at the existing West Damietta gas turbines plant.

The power plant has been operating since 2012; the proposed Combined Cycle Power Plant is 750 MW comprising four existing 125 MW Gas Turbine Generators (GTGs), each with a nominal electricity generating capacity of 125 MW and four Heat Recovery Steam Generators (HRSGs) utilizing the GTGs to produce enough steam in order to generate 250 MW in a steam turbine, which will be known as West Damietta Combined Cycle Power Plant.

The power output from the proposed plant will be sold to the Egyptian Electricity Transmission Company (EETC). The new project aims to convert the existing simple cycle to a combined cycle plant, which reduces the gas turbines’ exhaust gas temperature.

The power plant utilizes both natural gas and solar; this “dual-fuel” operability provides security of electricity provision in the event that gas supplies are unavailable for any reason. In addition, a small emergency generator operating on solar oil will also be provided on-site to operate key equipment within the power plant in the event of power supply failure.

The Environmental and Social Impact Assessment (ESIA) report is prepared by ECG, based on many baseline studies undertaken by independent national and international consultants and on the information provided by EEHC, EDEPC and their sub-contractors.

The post Environmental and Social Impact Assessment (ESIA) for Upgrading West Damietta Power Plant appeared first on ECG website.

]]>
Damanhour Combined Cycle Power Station /project/damanhour-combined-cycle-power-station/ Tue, 10 Dec 2019 12:05:18 +0000 https://ecgsa.com/?project=damanhour-combined-cycle-power-station Owned by the Egyptian Electricity Authority (EEA), the objective of the project was to upgrade the existing power station at Damanhour through the utilization of waste heat discharged to the atmosphere by gas turbines. The exhaust gases from the gas turbines were to be diverted through non-fired heat recovery boilers (HRSG) for the generation of … Continued

The post Damanhour Combined Cycle Power Station appeared first on ECG website.

]]>
Owned by the Egyptian Electricity Authority (EEA), the objective of the project was to upgrade the existing power station at Damanhour through the utilization of waste heat discharged to the atmosphere by gas turbines. The exhaust gases from the gas turbines were to be diverted through non-fired heat recovery boilers (HRSG) for the generation of steam. The generated steam produced an additional electrical power of 1×50 MW.

The project involved the addition of four heat recovery boilers to integrate four existing GE frame 5 Gas Turbines, into combined cycle mode of operation. This enabled the powering of 1×50 MW Turbo-Alternators.

The heat recovery boilers were to be arranged to produce superheated steam by extracting heat from the exhaust gases of the gas turbines. This superheated steam was to be used to drive a steam turbine generator. The heat recovery boilers were fitted to the gas turbines on a one- for-one basis. The superheated steam produced by four boilers was delivered to one main steam manifold which was connected to steam turbine generator of 50 MW steam driven nominal capacity.

The total plant consisting of heat recovery boilers, steam turbine generators and auxiliaries; was controlled and operated by a central control room. The plant also included: additional tank farms; cooling water systems fed by irrigation canals connected to the River Nile; electrical control and instrumentation systems; and civil/ structural works.

The project was implemented in four packages, namely:

  1. Heat Recovery Boiler Package, including: boilers and related structural steel, foundation works and associated facilities; pipe works; electrical cables and panels; instrumentation and control equipment; and some gas turbine modifications.
  2. Steam Turbine Package, including: steam turbines; alternators with necessary accessories; condensing plant and auxiliaries; main cooling water system; water treatment plant; fire protection system; compressed air system; cranes, hoists and handling equipment; electrical equipment; control and instrumentation equipment; and laboratory equipment.
  3. Electrical Power Package, including: circuit breakers; transformers; power boards; battery and charger systems; and associated cabling.
  4. Civil Works Package, including: turbine/control/ administration building, water treatment building and maintenance building (total area was 1,000 m2)  piled foundations for heat recovery boilers construction; cooling water system (intake structure, pumping station, inlet and outlet culverts, and outfall structure); external works e.g. roads, cable ducts, fencing and gates.

The post Damanhour Combined Cycle Power Station appeared first on ECG website.

]]>
Attaka Thermal Power Plant Extension (Unit IV – 300 MW) /project/attaka-thermal-power-plant-extension-unit-iv-300-mw/ Tue, 10 Dec 2019 12:05:16 +0000 https://ecgsa.com/?project=attaka-thermal-power-plant-extension-unit-iv-300-mw With a construction cost of US$ 300 million, the extension of Ataka Thermal Power Plant comprises a 300 MW steam turbine generator set, a 1,032 ton/h steam generator with auxiliaries 220 kV switchyard, new seawater intake and pump house, water treatment plant, chlorination plant, hydrogen generating plant, mazout storage tanks, mazout transfer station, high pressure … Continued

The post Attaka Thermal Power Plant Extension (Unit IV – 300 MW) appeared first on ECG website.

]]>
With a construction cost of US$ 300 million, the extension of Ataka Thermal Power Plant comprises a 300 MW steam turbine generator set, a 1,032 ton/h steam generator with auxiliaries 220 kV switchyard, new seawater intake and pump house, water treatment plant, chlorination plant, hydrogen generating plant, mazout storage tanks, mazout transfer station, high pressure heating station, natural gas reducing station, and industrial/sewage wastes treatment plants.

The turbine of the plant extension is of a condensing type, seawater cooled and consists of three cylinder reaction turbines. The process is regenerative cycle with high and low-pressure extraction. The turbo-alternator is two-pole 50 Hz, with 420 MVA rated output, 21 kV rated voltage and directly cooled by hydrogen. The steam generating plant has a controlled circulation boiler with a pressurized firebox and it contains a steam reheating system. The burners are designed for tangential firing and are of tilting type. The production of steam at MCR is 1,032 tons per hour of 54oc.

The boiler is capable of burning heavy fuel, light fuel and natural gas. The feed water plant is composed of one steam turbine-driven pump with 110% rated capacity  and two electric motor pumps each with 60% rated capacity. The main cooling water for the power plant is sea water led from the Gulf of Suez into an underground intake culvert then to an intake structure containing inlet screening racks with scraper, fine bank screens and the cooling water pumps.

The plant also contains a closed water system using demineralized water as coolant, which in turn is cooled by seawater. The auxiliary plants consist of:

  • Two train demineralization plants for the preparation of make-up water from utility raw water.
  • Two train condensate polishing plants consisting of an ionic and a mixed bed exchanger for removal of dissolved solids entering into the condensate main steam.
  • A chlorination plant to produce active chlorine from hypochlorite solution.
  • A hydrogen generating plant to produce the hydrogen required for cooling the generator.
  • A storage farm complete with pumping facilities and a heating plant for the storage of heavy and light fuel oil.
  • Facilities for the supply of natural gas at the required pressure are included.
  • A wastewater treatment plant to treat all industrial wastewater produced from Ataka Station is provided as an environmental feature meeting the standards required for the effluent, before the release into the Gulf of Suez.
  • A sewage treatment is also provided with Unit IV extension for the sanitary sewer of the whole station.

Out of generated power 300 MW is stepped up from 21 kV to 220 kV with the generator transformer and fed into the national grid through a switchyard provided for Unit IV extension. This switchyard consists of two main busbards of 2,000 A each connected by a coupler. These busbars are also connected to the existing two busbars via a longitudinal coupler. The transfer busbar composed of four feeders is linked to the national grid.

The switchyard includes pantograph isolators, SF-6 circuit breaker, rotating isolators, current transformers, potential transformers, surge arresters and insulators.

The post Attaka Thermal Power Plant Extension (Unit IV – 300 MW) appeared first on ECG website.

]]>
Marsa Alam Power Plant /project/marsa-alam-power-plant/ Tue, 10 Dec 2019 12:04:56 +0000 https://ecgsa.com/?project=marsa-alam-power-plant ECG was mandated the engineering services for phases I and II of the Marsa Alam Power Plant which housed dual fuel diesel generators with a total power generation capacity of 30 MW. In undertaking phase I of the power plant, ECG supervised the construction of ancillary buildings such as tank farms, water and fuel treatment plants, an … Continued

The post Marsa Alam Power Plant appeared first on ECG website.

]]>
ECG was mandated the engineering services for phases I and II of the Marsa Alam Power Plant which housed dual fuel diesel generators with a total power generation capacity of 30 MW. In undertaking phase I of the power plant, ECG supervised the construction of ancillary buildings such as tank farms, water and fuel treatment plants, an administration building, and a guard house.In phase II, ECG prepared detailed architectural, structural, and piping designs for tanks as well as fire detection and protection, electrical, and instrumentation and control systems.

 

The post Marsa Alam Power Plant appeared first on ECG website.

]]>
ElKuraimat New Combined Cycle Power Plant /project/elkuraimat-new-combined-cycle-power-plant/ Tue, 10 Dec 2019 12:04:50 +0000 https://ecgsa.com/?project=elkuraimat-new-combined-cycle-power-plant ElKureimat 750 MW Combined Cycle Project is located within the boundaries of the existing 2600 MW Thermal Power Plant site. ECG was involved in the civil design of phases II and III of ElKuraimat New Combined Cycle Power Plant. Phase II involved two-250 MW gas turbine generators,  two heat recovery steam generators, and one-250 MW … Continued

The post ElKuraimat New Combined Cycle Power Plant appeared first on ECG website.

]]>
ElKureimat 750 MW Combined Cycle Project is located within the boundaries of the existing 2600 MW Thermal Power Plant site. ECG was involved in the civil design of phases II and III of ElKuraimat New Combined Cycle Power Plant.

Phase II involved two-250 MW gas turbine generators,  two heat recovery steam generators, and one-250 MW steam turbine generator and condenser. Auxiliary facilities undertaken comprised a tank farm, water and wastewater treatment plants, a water intake/discharge, lift stations, a foam house, transformers, and a fuel oil unloading station.

Ancillary buildings developed included an administration building, a warehouse/work shop, a mosque, and a construction office building. Moving forward, phase III of the project comprised two-250 MW gas turbine generators, two heat recovery steam generators, and one-250 MW steam turbine generator and condenser. The power plant cooling water is withdrawn from the Nile River. When fully operated, the project will provide 750 MW generation capacity to Egypt’s Unified Power System, representing 6% of the country’s total electricity generation expansion during the period 2004/05-2011/12.

The post ElKuraimat New Combined Cycle Power Plant appeared first on ECG website.

]]>
Abu Qir Thermal Power Plant Intake Structure /project/abu-qir-thermal-power-plant-intake-structure/ Tue, 10 Dec 2019 12:04:47 +0000 https://ecgsa.com/?project=abu-qir-thermal-power-plant-intake-structure Expanding the capacity of the existing Abu Qir Power Plant involved the development of the Abu Qir Thermal Power Plant. Situated on the Mediterranean coast, 20 km east of Alexandria and to the east of the existing Abu Qir Power Plant, it comprised two-650 MW two indoor condensing steam turbine generating units; two outdoor, dual-fuel fired, … Continued

The post Abu Qir Thermal Power Plant Intake Structure appeared first on ECG website.

]]>
Expanding the capacity of the existing Abu Qir Power Plant involved the development of the Abu Qir Thermal Power Plant. Situated on the Mediterranean coast, 20 km east of Alexandria and to the east of the existing Abu Qir Power Plant, it comprised two-650 MW two indoor condensing steam turbine generating units; two outdoor, dual-fuel fired, pressurized furnace steam generators and necessary auxiliary equipment including onsite storage, a natural gas reducing and handling facility, desalination plant for plant make-up water, off- shore structures for plant cooling water intake and discharge, water and wastewater treatment and GIS 500 kV indoor switchyard buildings. While the main fuel is natural gas, the plant was also designed to run on heavy fuel (Mazout) oil as a backup fuel.

ECG was awarded the quality control for this project which included, quality control for the ready mix concert plant, preparing the quality control plan for the civil works, managing the quality control plan with the auditing boards, correction actions for the NCR and supervised all the works to be sure it matches with the quality control plan. The structure scope of work included the intake structure, intake operation building and discharge to seal well structure.

The post Abu Qir Thermal Power Plant Intake Structure appeared first on ECG website.

]]>
Abu Qir Thermal Power Plant /project/abu-qir-thermal-power-plant/ Tue, 10 Dec 2019 12:04:40 +0000 https://ecgsa.com/?project=abu-qir-thermal-power-plant Expanding the capacity of the existing Abu Qir Power Plant, involved the development of the new Abu Qir Thermal Power Plant. Situated on the Mediterranean coast, 20 km east of Alexandria and to the east of the existing Abu Qir Power Plant, the new plant comprises two 650 MW indoor condensing steam turbine generating units; … Continued

The post Abu Qir Thermal Power Plant appeared first on ECG website.

]]>
Expanding the capacity of the existing Abu Qir Power Plant, involved the development of the new Abu Qir Thermal Power Plant. Situated on the Mediterranean coast, 20 km east of Alexandria and to the east of the existing Abu Qir Power Plant, the new plant comprises two 650 MW indoor condensing steam turbine generating units; two outdoor, dual-fuel fired (natural gas and mazut), pressurized furnace steam generators; and necessary auxiliary equipment including onsite storage; a natural gas reducing and handling facility; desalination plant for plant make-up water, off-shore structures for plant cooling water intake and discharge; water and wastewater treatment and GIS 500 kV indoor switchyard buildings. While the main fuel is natural gas, the plant was also designed to run on heavy fuel (mazut) oil as a backup fuel.

With a construction cost of 875 million euro for this state funded project, the objective was to increase the generation capacity of the Unified Power System (UPS) by about 4% in the year 2012 to meet the electricity demand on the UPS in the short-to-medium term. The project, when completed, would contribute to making available sufficient and reliable power to the various consumers including the households, agriculture, business and industries.

ECG has completed the detailed designs of the underground utility networks (water, sewage, and irrigation); asphalt-paved roads (3,100 m long, with carriageway width of 7 m); and landscaping; alongside the electrical detailed designs of all site buildings.

The post Abu Qir Thermal Power Plant appeared first on ECG website.

]]>
West Damietta Gas Turbine Generating Plant /project/west-damietta-gas-turbine-generating-plant/ Tue, 10 Dec 2019 12:04:38 +0000 https://ecgsa.com/?project=west-damietta-gas-turbine-generating-plant Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of Egypt West Damietta Gas Turbine Generating Plant (GTGP). ECG was invited by KN to provide the engineering design services in support to their EPC contract. The first gas turbine unit was planned to start commercial operation on July, 2012 for Damietta GTGP. … Continued

The post West Damietta Gas Turbine Generating Plant appeared first on ECG website.

]]>
Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of Egypt West Damietta Gas Turbine Generating Plant (GTGP). ECG was invited by KN to provide the engineering design services in support to their EPC contract.

The first gas turbine unit was planned to start commercial operation on July, 2012 for Damietta GTGP. Subsequently, ECG set its fast track methodology to fully complete the design services in a period satisfying KN proposed schedule requirements.

The new plant has four new gas turbines with a total rated capacity of 500 MW using 4*125 MW gas turbines.

Understanding the importance, sensitivity and urgency for implementing the plant within the time constrain being a national “on spot” project, ECG quickly set a task force from its senior staff to plan and set the project staffing requirements and the immediate mobilization of task forces, fast-track quality control measures, and packaging of deliverables which were tailored to meet KN milestones, enabled the quick start of construction and allowed for a continuous flow of KN construction execution scheme.

ECG Scope of Services covered the following:

  • Package 1: Enabling work
  • Package 2: Foundation package
  • Package 3: Tank farm design
  • Package 4: Auxiliary Systems (service water system, compressed air system, solar fuel system, fire protection system, GIS substation, control s/s, LV transformer, control building, etc)
  • Package 5: Infrastructure networks
  • Package 6: Ancillary building

The post West Damietta Gas Turbine Generating Plant appeared first on ECG website.

]]>
Damietta Gas Turbine Generating Plant /project/damietta-gas-turbine-generating-plant/ Tue, 10 Dec 2019 12:04:27 +0000 https://ecgsa.com/?project=damietta-gas-turbine-generating-plant Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of Egypt Damietta Gas Turbine Generating Plant (GTGP). ECG was invited by KN to provide the engineering design services in support to their EPC contract. The first gas turbine unit started commercial operation on July, 2011 for Damietta GTGP. Subsequently, ECG set its … Continued

The post Damietta Gas Turbine Generating Plant appeared first on ECG website.

]]>
Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of Egypt Damietta Gas Turbine Generating Plant (GTGP). ECG was invited by KN to provide the engineering design services in support to their EPC contract.

The first gas turbine unit started commercial operation on July, 2011 for Damietta GTGP. Subsequently, ECG set its fast track methodology to fully complete the design services in a period satisfying KN proposed schedule requirements.

The new plant has four new gas turbines with a total rated capacity of 500 MW using 4*125 MW gas turbines.

Understanding the importance, sensitivity and urgency for implementing the plant within the time constrain being a national “on spot” project, ECG quickly set a task force from its senior staff to plan and set the project staffing requirements and the immediate mobilization of task forces, fast-track quality control measures, and packaging of deliverables which were tailored to meet KN milestones, enabled the quick start of construction and allowed for a continuous flow of KN construction execution scheme.

ECG Scope of Services covers the following:

  • Package 1: Enabling work
  • Package 2: Foundation package
  • Package 3: Tank farm design
  • Package 4: Auxiliary systems (service water system, compressed air system, solar fuel system, fire fighting system, GIS substation, control s/s, LV transformer, control building, etc)
  • Package 5: Infrastructure networks
  • Package 6: Ancillary buildings

 

The post Damietta Gas Turbine Generating Plant appeared first on ECG website.

]]>
Al-Shabab Gas Turbine Generating Plant /project/al-shabab-gas-turbine-generating-plant/ Tue, 10 Dec 2019 12:04:24 +0000 https://ecgsa.com/?project=al-shabab-gas-turbine-generating-plant Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of Egypt Al-Shabab Gas Turbine Generating Plant (GTGP). ECG was invited by KN to provide the engineering design services in support to their EPC contract. The first gas turbine unit started commercial operation on June, 2011 for Al-Shabab GTGP. Subsequently, ECG set its fast … Continued

The post Al-Shabab Gas Turbine Generating Plant appeared first on ECG website.

]]>
Kharafi National (KN) was awarded the Engineering, Procurement and Construction (EPC) contract of Egypt Al-Shabab Gas Turbine Generating Plant (GTGP). ECG was invited by KN to provide the engineering design services in support to their EPC contract.

The first gas turbine unit started commercial operation on June, 2011 for Al-Shabab GTGP. Subsequently, ECG set its fast track methodology to fully complete the design services in a period satisfying KN proposed schedule requirements.

The new plant has eight new gas turbines with a total rated capacity of 1,000 MW using 8*125 MW gas turbines.

Understanding the importance, sensitivity and urgency for implementing the plant within the time constraint being a national “on spot” project, ECG quickly set a task force from its senior staff to plan and set the project staffing requirements and the immediate mobilization of task forces, fast-track quality control measures, and packaging of deliverables which were tailored to meet KN milestones, enabled the quick start of construction and allowed for a continuous flow of KN construction execution scheme.

ECG Scope of Services covered the following:

  • Package 1: Enabling work
  • Package 2: Foundation package
  • Package 3: Tank farm design
  • Package 4: Auxiliary systems (service water system, compressed air system, solar fuel system, fire protection system, GIS substation, control s/s, LV transformer, control building, etc)
  • Package 5: Infrastructure networks
  • Package 6: Ancillary buildings

 

The post Al-Shabab Gas Turbine Generating Plant appeared first on ECG website.

]]>
Maintenance and Refurbishment of SSR Towers and Poles /project/maintenance-and-refurbishment-of-ssr-towers-and-poles/ Tue, 10 Dec 2019 12:04:18 +0000 https://ecgsa.com/?project=maintenance-and-refurbishment-of-ssr-towers-and-poles Since 1995, more than 1,900 Self Supporting Radio Transmission (SSR) towers, masts and poles inspections were completely carried out. Inspection of 200 towers, masts and poles are underway for maintenance and refurbishment work, in addition to supervision of refurbishment work for 116 towers all over UAE.

The post Maintenance and Refurbishment of SSR Towers and Poles appeared first on ECG website.

]]>
Since 1995, more than 1,900 Self Supporting Radio Transmission (SSR) towers, masts and poles inspections were completely carried out. Inspection of 200 towers, masts and poles are underway for maintenance and refurbishment work, in addition to supervision of refurbishment work for 116 towers all over UAE.

The post Maintenance and Refurbishment of SSR Towers and Poles appeared first on ECG website.

]]>
Cairo Festival City 66/22 KV Substation /project/cairo-festival-city-66-22-kv-substation/ Tue, 10 Dec 2019 12:04:13 +0000 https://ecgsa.com/?project=cairo-festival-city-66-22-kv-substation The project comprised the design, construction supervision, commissioning and handover of a 66/22 kv electrical substation and its connection cables with the external main grid to feed the Cairo Festival City (CFC) project. The 66/22 kv substation is part of the site wide infrastructure and associated projects for Cairo Festival City located at the 5th … Continued

The post Cairo Festival City 66/22 KV Substation appeared first on ECG website.

]]>
The project comprised the design, construction supervision, commissioning and handover of a 66/22 kv electrical substation and its connection cables with the external main grid to feed the Cairo Festival City (CFC) project.

The 66/22 kv substation is part of the site wide infrastructure and associated projects for Cairo Festival City located at the 5th Conglomerate in New Cairo.The said substation is interconnected with New Cairo Station, 12 km apart throughout 630 mm2 cables (route no.1) and with Zahraa Madinet Nasr-Police Academy Station, 3.5 km apart throughout 400 mm2 cables (route no.2).

The CFC Substation is built on an area of 3,042 m2, and consists of five buildings as follows:

  • 66 kv building (66 kv switchgears and bus bars): consists of one floor with a footprint area of about 650 m2.
  • 22 kv building (22 kv switchgear, control hall, AC/DC room, telecommunication room, battery room and auxiliary transformers): consists of basement and two floors with a footprint area of about 385 m2.
  • Guard room: consists of one floor with a footprint area of about 20 m2.
  • Fire-fighting room: consists of one floor with a footprint area of about 25 m2.
  • Store room: consists of one floor with a foot print area of about 28 m2.
  • Underground water tank and pump room: with a foot print area of about 85 m2.

 