{"id":1665,"date":"2017-04-12T16:07:47","date_gmt":"2019-12-10T10:24:16","guid":{"rendered":"https:\/\/ecgsa.com\/engineering-services-for-dunga-phase-ii-15-mw-power-plant-kazakhstan\/"},"modified":"2019-12-16T08:16:04","modified_gmt":"2019-12-16T08:16:04","slug":"engineering-services-for-dunga-phase-ii-15-mw-power-plant-kazakhstan","status":"publish","type":"post","link":"https:\/\/www.ecgsa.com\/engineering-services-for-dunga-phase-ii-15-mw-power-plant-kazakhstan\/","title":{"rendered":"Engineering Services for DUNGA Phase II 15 MW Power Plant, Kazakhstan"},"content":{"rendered":"
Consolidated Sicon Power Company (CSPC) awarded ECG the contract to provide pre-tender consultancy services for DUNGA Phase II 15 MW Power Plant.<\/p>\n
The project consists mainly of four turbines located at the main building, which is composed of turbine housing area with approximately 15 meter clear height, main control space consisting of two floors, in addition to workshop space. The main turbine building is steel-structured and includes foundations for the turbines and heat exchanger as well as foundations for the stacks.<\/p>\n
ECG scope includes providing pre-tender services for the project in order to enable the Contractor to price and submit a quality cost competitive proposal.<\/p>\n","protected":false},"excerpt":{"rendered":"
Consolidated Sicon Power Company (CSPC) awarded ECG the contract to provide pre-tender consultancy services for DUNGA Phase II 15 MW Power Plant. The project consists mainly of four turbines located at the main building, which is composed of turbine housing area with approximately 15 meter clear height, main control space consisting of two floors, in … Continued<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"country":[],"sector":[],"yoast_head":"\n