{"id":1845,"date":"2017-04-13T15:00:47","date_gmt":"2019-12-10T10:26:50","guid":{"rendered":"https:\/\/ecgsa.com\/stage-ii-phase-ii-of-el-gabal-el-asfar-waste-water-treatment-plant\/"},"modified":"2019-12-16T08:16:08","modified_gmt":"2019-12-16T08:16:08","slug":"stage-ii-phase-ii-of-el-gabal-el-asfar-waste-water-treatment-plant","status":"publish","type":"post","link":"https:\/\/www.ecgsa.com\/stage-ii-phase-ii-of-el-gabal-el-asfar-waste-water-treatment-plant\/","title":{"rendered":"Stage II, Phase II of El Gabal El Asfar Waste-Water Treatment Plant"},"content":{"rendered":"
Misr Sons Development (Hassan Allam Sons) awarded ECG the contract to provide consultancy services for Phase II of El-Gabal El-Asfar Wastewater Treatment Plant (WWTP) extension. The WWTP plant has an average capacity of 500,000m3<\/sup>\/day and consists of secondary treatment, sludge digestion, gas recovery and power generation.<\/p>\n The completion of Stage II is planned to deliver an average raw sewage inflow of 1,000,000m3<\/sup>\/day. The first phase is currently underway, and has been designed to provide treatment for an inflow of 500,000m3<\/sup>\/day.<\/p>\n ECG scope covers the design development and detailed design for civil engineering structure and building works.<\/p>\n","protected":false},"excerpt":{"rendered":" Misr Sons Development (Hassan Allam Sons) awarded ECG the contract to provide consultancy services for Phase II of El-Gabal El-Asfar Wastewater Treatment Plant (WWTP) extension. The WWTP plant has an average capacity of 500,000m3\/day and consists of secondary treatment, sludge digestion, gas recovery and power generation. The completion of Stage II is planned to deliver … Continued<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"country":[],"sector":[],"yoast_head":"\n