{"id":1888,"date":"2017-04-13T15:41:01","date_gmt":"2019-12-10T10:27:20","guid":{"rendered":"https:\/\/ecgsa.com\/dewa-400-132-kv-mbr-solar-park-substation-dubai-uae\/"},"modified":"2019-12-16T08:16:09","modified_gmt":"2019-12-16T08:16:09","slug":"dewa-400-132-kv-mbr-solar-park-substation-dubai-uae","status":"publish","type":"post","link":"https:\/\/www.ecgsa.com\/dewa-400-132-kv-mbr-solar-park-substation-dubai-uae\/","title":{"rendered":"DEWA 400\/132 KV MBR Solar Park Substation, Dubai, UAE"},"content":{"rendered":"
Dubai Electricity & Water Authority (DEWA) constructs MBR Solar Park substation (400\/132 kV) located in Saih Al Dahal. The substation contains three main buildings (B+G) with a height of 17 metre, a control building as well as two ancillary buildings for fire pump and security.<\/p>\n
ECG’s scope covers construction supervision and design permits.<\/p>\n","protected":false},"excerpt":{"rendered":"
Dubai Electricity & Water Authority (DEWA) constructs MBR Solar Park substation (400\/132 kV) located in Saih Al Dahal. The substation contains three main buildings (B+G) with a height of 17 metre, a control building as well as two ancillary buildings for fire pump and security. ECG’s scope covers construction supervision and design permits.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"country":[],"sector":[],"yoast_head":"\n