{"id":1991,"date":"2017-04-13T16:32:21","date_gmt":"2019-12-10T10:28:11","guid":{"rendered":"https:\/\/ecgsa.com\/water-lines-for-construction-works-irrigation-at-the-new-administrative-capital-egypt\/"},"modified":"2019-12-16T08:16:11","modified_gmt":"2019-12-16T08:16:11","slug":"water-lines-for-construction-works-irrigation-at-the-new-administrative-capital-egypt","status":"publish","type":"post","link":"https:\/\/www.ecgsa.com\/water-lines-for-construction-works-irrigation-at-the-new-administrative-capital-egypt\/","title":{"rendered":"Water Lines for Construction Works & Irrigation at the New Administrative Capital, Egypt"},"content":{"rendered":"
Potable water supply to the new Administrative Capital depends on establishing a new water treatment plant (WTP) with a capacity of 2 million cubic meters to serve a population of 6 million inhabitants. However, as the construction of the new WTP can take 5 to 7 years, it was necessary to adopt an urgent and practical solution to fulfill the water demand for construction and irrigation works in the Administrative Capital.<\/p>\n
The project comprises the following components: ECG’s scope covers the Basis of Design Report, detailed design, and tender documents.<\/p>\n","protected":false},"excerpt":{"rendered":" Potable water supply to the new Administrative Capital depends on establishing a new water treatment plant (WTP) with a capacity of 2 million cubic meters to serve a population of 6 million inhabitants. However, as the construction of the new WTP can take 5 to 7 years, it was necessary to adopt an urgent and … Continued<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"country":[],"sector":[],"yoast_head":"\n
1. Laying a water pipeline for construction works up until the construction of a WTP
is completed.
2. Provision of irrigation water from the Orasqualia Wastewater Treatment Plant through
a Samcrete pump with a capacity of 120,000 m3<\/sup>\/day (1st<\/sup> Phase).<\/p>\n