{"id":2023,"date":"2017-04-13T17:15:00","date_gmt":"2019-12-10T10:28:23","guid":{"rendered":"https:\/\/ecgsa.com\/alstom-4-substations-egypt\/"},"modified":"2019-12-16T08:16:11","modified_gmt":"2019-12-16T08:16:11","slug":"alstom-4-substations-egypt","status":"publish","type":"post","link":"https:\/\/www.ecgsa.com\/alstom-4-substations-egypt\/","title":{"rendered":"Alstom 4 Substations, Egypt"},"content":{"rendered":"
The project consists of four substations located at New Cairo, Beni Suef, East Ismailia, and Mansoura over a total land area of 96,375 m2<\/sup>. <\/p>\n Each substation consists of the following components: gantry area, control building, 220 KV GIS building, 66 KV switchgear building, MV switchgear building, 40 MVA transformer building, 175 MVA transformer building, firefighting building, guard room, utility buildings & services, and water tanks.<\/p>\n ECG’s scope of work covers detailed design and shop drawings.<\/p>\n","protected":false},"excerpt":{"rendered":" The project consists of four substations located at New Cairo, Beni Suef, East Ismailia, and Mansoura over a total land area of 96,375 m2. Each substation consists of the following components: gantry area, control building, 220 KV GIS building, 66 KV switchgear building, MV switchgear building, 40 MVA transformer building, 175 MVA transformer building, firefighting … Continued<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"country":[],"sector":[],"yoast_head":"\n