{"id":2280,"date":"2017-10-15T17:42:14","date_gmt":"2019-12-10T10:30:00","guid":{"rendered":"https:\/\/ecgsa.com\/wastewater-treatment-plant-in-the-administrative-capital-phase-i\/"},"modified":"2019-12-16T08:16:16","modified_gmt":"2019-12-16T08:16:16","slug":"wastewater-treatment-plant-in-the-administrative-capital-phase-i","status":"publish","type":"post","link":"https:\/\/www.ecgsa.com\/wastewater-treatment-plant-in-the-administrative-capital-phase-i\/","title":{"rendered":"Wastewater Treatment Plant in the Administrative Capital Phase I"},"content":{"rendered":"
The Construction Authority for Potable Water & Wastewater (CAPW) has entrusted ECG the master-planning, detailed design, and tender documents for the Wastewater Treatment Plant for the New Administrative Capital (Phase 1). The project has a capacity of 150,000 m3<\/sup>\/day, expandable to a maximum capacity of 2,200,000 m3<\/sup>\/day.<\/p>\n Wastewater treatment processes are designed according to the latest local and international standards; this includes tertiary treatment, as well as nitrogen and phosphorus removal, to meet the requirements of the “Egyptian Code for the Reuse of Treated Wastewater for Agricultural Purposes.”<\/p>\n","protected":false},"excerpt":{"rendered":" The Construction Authority for Potable Water & Wastewater (CAPW) has entrusted ECG the master-planning, detailed design, and tender documents for the Wastewater Treatment Plant for the New Administrative Capital (Phase 1). The project has a capacity of 150,000 m3\/day, expandable to a maximum capacity of 2,200,000 m3\/day. Wastewater treatment processes are designed according to the … Continued<\/a><\/p>\n","protected":false},"author":1,"featured_media":2281,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[399,400,398,401,397],"country":[],"sector":[],"yoast_head":"\n