{"id":10250,"date":"2023-11-07T12:57:39","date_gmt":"2023-11-07T12:57:39","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=10250"},"modified":"2024-11-12T14:27:41","modified_gmt":"2024-11-12T14:27:41","slug":"beleza-and-hirgigo-power-plants","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/beleza-and-hirgigo-power-plants\/","title":{"rendered":"Beleza and Hirgigo Power Plants"},"content":{"rendered":"
The Eritrean Electricity Corporation aims at improving the production capacity of two main stations in the inter-connected grid, namely Beleza and Hirgigo, which serves a number of major cities and surrounding rural areas. The company intends to produce 132 MW in addition to the current capacity of 151.1 MW through the erection of 3 engines (8MW each) in Beleza power plant and rehabilitation of Hirgigo power plant.<\/p>\n
Beleza Power Plant<\/u><\/p>\n
ECG scope of works includes collecting, reviewing, analyzing and commenting on the tender package submitted by the Contractor. Erection of the new 3 engines include the following components:<\/p>\n
Hirgigo Power Plant<\/u><\/p>\n
ECG prepares a complete set of tender documents with the relevant drawings, data sheets and spare parts to ease the process of issuing an international tender for overhauling 4 generating sets and common facilities.<\/p>\n
Works cover:<\/p>\n
ECG scope of work includes project management, and construction supervision, in addition to on-the-job training for qualified counterpart engineers and technicians.<\/p>\n","protected":false},"featured_media":14832,"template":"","activity":[556,567,558,565,561],"country":[936],"scope":[],"sector":[252,253],"yoast_head":"\n