{"id":14506,"date":"2024-07-10T09:19:33","date_gmt":"2024-07-10T09:19:33","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=14506"},"modified":"2024-07-10T09:19:33","modified_gmt":"2024-07-10T09:19:33","slug":"critical-asset-resilience-program-carp-doha-north-area","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/","title":{"rendered":"Critical Asset Resilience Program (CARP) – Doha North Area"},"content":{"rendered":"

The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North.
\nThe works addressed by the project comprises design, supply, execution, testing and completion of surface water networks, storage tank, pumping stations, emergency flooding areas and earth barrier\/bunds as well as remediation of defects of the existing surface water network, if found. The eight locations are as follows:
\n\u2022\tLocation 1 – Bani Hajer & Qatar Academy area: 84.823 m bund wall and 1,300 m of storage pipes (300 mm to 1000mm dia.).
\n\u2022\tLocation 2 – New Al Rayyan:1000mm bypass pipe to connect to SW2A.
\n\u2022\tLocation 3 – Dukhan Central – Duhaliyat: 2 bund walls with 222 m total length, 2 new proposed ponds\/EFAs (449 m3 and 662 m3), 3 existing EFAs to be upgraded (2827 m3, 4850 m3 and 7124m3) and abandoned pipes (3x400mm and 1x500mm)
\n\u2022\tLocation 4 \u2013 Al-Wajba Underpass: 3 bund walls with 493 m total length and additional channels in the lowest points
\n\u2022\tLocation 5 \u2013 Al-Rayyan Interchange: A channel in the lowest points in the underpass
\n\u2022\tLocation 6 \u2013 Al-Jahhaniya Interchange at MOQ (TRN Route): 392 m long bund wall
\n\u2022\tLocation 7 – C4-1 between Lusail Exp. and West Bay St.: 64 m3 offline tank and 49 m of 600 mm pipeline.
\n\u2022\tLocation 8 – along Orbital Road (TRN Route): 245 m long bund wall at 0.60 m height<\/p>\n","protected":false},"featured_media":14508,"template":"","activity":[939,566],"country":[149],"scope":[],"sector":[256,262],"yoast_head":"\nCritical Asset Resilience Program (CARP) - Doha North Area - ECG website<\/title>\n<meta name=\"description\" content=\"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Critical Asset Resilience Program (CARP) - Doha North Area - ECG website\" \/>\n<meta property=\"og:description\" content=\"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/\" \/>\n<meta property=\"og:site_name\" content=\"ECG website\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720603081_587_191603_1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1100\" \/>\n\t<meta property=\"og:image:height\" content=\"521\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/\",\"url\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/\",\"name\":\"Critical Asset Resilience Program (CARP) - Doha North Area - ECG website\",\"isPartOf\":{\"@id\":\"https:\/\/www.ecgsa.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720603081_587_191603_1.jpg\",\"datePublished\":\"2024-07-10T09:19:33+00:00\",\"dateModified\":\"2024-07-10T09:19:33+00:00\",\"description\":\"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#primaryimage\",\"url\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720603081_587_191603_1.jpg\",\"contentUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720603081_587_191603_1.jpg\",\"width\":1100,\"height\":521,\"caption\":\"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North. The works addressed by the project comprises design, supply, execution, testing and completion of surface water networks, storage tank, pumping stations, emergency flooding areas and earth barrier\/bunds as well as remediation of defects of the existing surface water network, if found. The eight locations are as follows: \u2022 Location 1 - Bani Hajer & Qatar Academy area: 84.823 m bund wall and 1,300 m of storage pipes (300 mm to 1000mm dia.). \u2022 Location 2 - New Al Rayyan:1000mm bypass pipe to connect to SW2A. \u2022 Location 3 - Dukhan Central - Duhaliyat: 2 bund walls with 222 m total length, 2 new proposed ponds\/EFAs (449 m3 and 662 m3), 3 existing EFAs to be upgraded (2827 m3, 4850 m3 and 7124m3) and abandoned pipes (3x400mm and 1x500mm) \u2022 Location 4 \u2013 Al-Wajba Underpass: 3 bund walls with 493 m total length and additional channels in the lowest points \u2022 Location 5 \u2013 Al-Rayyan Interchange: A channel in the lowest points in the underpass \u2022 Location 6 \u2013 Al-Jahhaniya Interchange at MOQ (TRN Route): 392 m long bund wall \u2022 Location 7 - C4-1 between Lusail Exp. and West Bay St.: 64 m3 offline tank and 49 m of 600 mm pipeline. \u2022 Location 8 - along Orbital Road (TRN Route): 245 m long bund wall at 0.60 m height\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ecgsa.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.ecgsa.com\/project\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Critical Asset Resilience Program (CARP) – Doha North Area\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ecgsa.com\/#website\",\"url\":\"https:\/\/www.ecgsa.com\/\",\"name\":\"ECG website\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ecgsa.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n","yoast_head_json":{"title":"Critical Asset Resilience Program (CARP) - Doha North Area - ECG website","description":"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/","og_locale":"en_US","og_type":"article","og_title":"Critical Asset Resilience Program (CARP) - Doha North Area - ECG website","og_description":"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North.","og_url":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/","og_site_name":"ECG website","og_image":[{"width":1100,"height":521,"url":"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720603081_587_191603_1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/","url":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/","name":"Critical Asset Resilience Program (CARP) - Doha North Area - ECG website","isPartOf":{"@id":"https:\/\/www.ecgsa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#primaryimage"},"image":{"@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720603081_587_191603_1.jpg","datePublished":"2024-07-10T09:19:33+00:00","dateModified":"2024-07-10T09:19:33+00:00","description":"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North.","breadcrumb":{"@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#primaryimage","url":"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720603081_587_191603_1.jpg","contentUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720603081_587_191603_1.jpg","width":1100,"height":521,"caption":"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for eight (8) locations in different areas within Doha North. The works addressed by the project comprises design, supply, execution, testing and completion of surface water networks, storage tank, pumping stations, emergency flooding areas and earth barrier\/bunds as well as remediation of defects of the existing surface water network, if found. The eight locations are as follows: \u2022 Location 1 - Bani Hajer & Qatar Academy area: 84.823 m bund wall and 1,300 m of storage pipes (300 mm to 1000mm dia.). \u2022 Location 2 - New Al Rayyan:1000mm bypass pipe to connect to SW2A. \u2022 Location 3 - Dukhan Central - Duhaliyat: 2 bund walls with 222 m total length, 2 new proposed ponds\/EFAs (449 m3 and 662 m3), 3 existing EFAs to be upgraded (2827 m3, 4850 m3 and 7124m3) and abandoned pipes (3x400mm and 1x500mm) \u2022 Location 4 \u2013 Al-Wajba Underpass: 3 bund walls with 493 m total length and additional channels in the lowest points \u2022 Location 5 \u2013 Al-Rayyan Interchange: A channel in the lowest points in the underpass \u2022 Location 6 \u2013 Al-Jahhaniya Interchange at MOQ (TRN Route): 392 m long bund wall \u2022 Location 7 - C4-1 between Lusail Exp. and West Bay St.: 64 m3 offline tank and 49 m of 600 mm pipeline. \u2022 Location 8 - along Orbital Road (TRN Route): 245 m long bund wall at 0.60 m height"},{"@type":"BreadcrumbList","@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-north-area\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ecgsa.com\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.ecgsa.com\/project\/"},{"@type":"ListItem","position":3,"name":"Critical Asset Resilience Program (CARP) – Doha North Area"}]},{"@type":"WebSite","@id":"https:\/\/www.ecgsa.com\/#website","url":"https:\/\/www.ecgsa.com\/","name":"ECG website","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ecgsa.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/14506"}],"collection":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/14506\/revisions"}],"predecessor-version":[{"id":14509,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/14506\/revisions\/14509"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media\/14508"}],"wp:attachment":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media?parent=14506"}],"wp:term":[{"taxonomy":"activity","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/activity?post=14506"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/country?post=14506"},{"taxonomy":"scope","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/scope?post=14506"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/sector?post=14506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}