{"id":14510,"date":"2024-07-10T09:53:02","date_gmt":"2024-07-10T09:53:02","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=14510"},"modified":"2024-07-10T09:53:02","modified_gmt":"2024-07-10T09:53:02","slug":"critical-asset-resilience-program-carp-doha-south-area","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/","title":{"rendered":"Critical Asset Resilience Program (CARP) – Doha South Area"},"content":{"rendered":"

The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South.
\nThe works addressed by the project comprises design, supply, execution, testing and completion of surface water networks, storage tank, pumping stations, emergency flooding areas and earth barrier\/bunds as well as remediation of defects of existing surface water network, if found. The eight locations are as follows:
\n\u2022\tLocation 1 – Mamoura Tunnel (E-Ring): Collection capacity enhancement by adding channel in the low point of the underpass
\n\u2022\tLocation 2 \u2013 C23-1 (Junction of Ahmed Bin Ali Street with Mohammad Bin Thani Street – TRN Routes): 1,380-meter micro-tunnel (dia: 1,400 mm) connected to AGO micro-tunnel
\n\u2022\tLocation 3 \u2013 C39-1, C39-2 and C52-1 (Junction of Rawdat Al-Khail with C-Ring Road and the surrounding areas \u2013 TRN Routes): 1,645-meter micro-tunnel with pipe diameters ranging from 800mm to 1,000 mm
\n\u2022\tLocation 4 \u2013 C160 (C-Ring Road near Old Airport Road \u2013 TRN Routes): 450 m of storage pipes with diameters ranging from 1,200 mm to 2,000mm
\n\u2022\tLocation 5 \u2013 C145 (Al Wakra Area \u2013 TRN Routes): 3,750-meter pipeline with diameters ranging from 300 mm to 800 mm<\/p>\n","protected":false},"featured_media":14512,"template":"","activity":[939,566],"country":[149],"scope":[],"sector":[256,262],"yoast_head":"\nCritical Asset Resilience Program (CARP) - Doha South Area - ECG website<\/title>\n<meta name=\"description\" content=\"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Critical Asset Resilience Program (CARP) - Doha South Area - ECG website\" \/>\n<meta property=\"og:description\" content=\"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/\" \/>\n<meta property=\"og:site_name\" content=\"ECG website\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720605083_219_238136_1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1101\" \/>\n\t<meta property=\"og:image:height\" content=\"520\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/\",\"url\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/\",\"name\":\"Critical Asset Resilience Program (CARP) - Doha South Area - ECG website\",\"isPartOf\":{\"@id\":\"https:\/\/www.ecgsa.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720605083_219_238136_1.jpg\",\"datePublished\":\"2024-07-10T09:53:02+00:00\",\"dateModified\":\"2024-07-10T09:53:02+00:00\",\"description\":\"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#primaryimage\",\"url\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720605083_219_238136_1.jpg\",\"contentUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720605083_219_238136_1.jpg\",\"width\":1101,\"height\":520,\"caption\":\"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South. The works addressed by the project comprises design, supply, execution, testing and completion of surface water networks, storage tank, pumping stations, emergency flooding areas and earth barrier\/bunds as well as remediation of defects of existing surface water network, if found. The eight locations are as follows: \u2022 Location 1 - Mamoura Tunnel (E-Ring): Collection capacity enhancement by adding channel in the low point of the underpass \u2022 Location 2 \u2013 C23-1 (Junction of Ahmed Bin Ali Street with Mohammad Bin Thani Street - TRN Routes): 1,380-meter micro-tunnel (dia: 1,400 mm) connected to AGO micro-tunnel \u2022 Location 3 \u2013 C39-1, C39-2 and C52-1 (Junction of Rawdat Al-Khail with C-Ring Road and the surrounding areas \u2013 TRN Routes): 1,645-meter micro-tunnel with pipe diameters ranging from 800mm to 1,000 mm \u2022 Location 4 \u2013 C160 (C-Ring Road near Old Airport Road \u2013 TRN Routes): 450 m of storage pipes with diameters ranging from 1,200 mm to 2,000mm \u2022 Location 5 \u2013 C145 (Al Wakra Area \u2013 TRN Routes): 3,750-meter pipeline with diameters ranging from 300 mm to 800 mm\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ecgsa.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.ecgsa.com\/project\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Critical Asset Resilience Program (CARP) – Doha South Area\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ecgsa.com\/#website\",\"url\":\"https:\/\/www.ecgsa.com\/\",\"name\":\"ECG website\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ecgsa.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n","yoast_head_json":{"title":"Critical Asset Resilience Program (CARP) - Doha South Area - ECG website","description":"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/","og_locale":"en_US","og_type":"article","og_title":"Critical Asset Resilience Program (CARP) - Doha South Area - ECG website","og_description":"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South.","og_url":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/","og_site_name":"ECG website","og_image":[{"width":1101,"height":520,"url":"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720605083_219_238136_1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/","url":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/","name":"Critical Asset Resilience Program (CARP) - Doha South Area - ECG website","isPartOf":{"@id":"https:\/\/www.ecgsa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#primaryimage"},"image":{"@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720605083_219_238136_1.jpg","datePublished":"2024-07-10T09:53:02+00:00","dateModified":"2024-07-10T09:53:02+00:00","description":"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South.","breadcrumb":{"@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#primaryimage","url":"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720605083_219_238136_1.jpg","contentUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2024\/07\/1720605083_219_238136_1.jpg","width":1101,"height":520,"caption":"The project aims to upgrade the capacity of the storm water assets and solve the possible flooding issues for five (5) locations in different areas within Doha South. The works addressed by the project comprises design, supply, execution, testing and completion of surface water networks, storage tank, pumping stations, emergency flooding areas and earth barrier\/bunds as well as remediation of defects of existing surface water network, if found. The eight locations are as follows: \u2022 Location 1 - Mamoura Tunnel (E-Ring): Collection capacity enhancement by adding channel in the low point of the underpass \u2022 Location 2 \u2013 C23-1 (Junction of Ahmed Bin Ali Street with Mohammad Bin Thani Street - TRN Routes): 1,380-meter micro-tunnel (dia: 1,400 mm) connected to AGO micro-tunnel \u2022 Location 3 \u2013 C39-1, C39-2 and C52-1 (Junction of Rawdat Al-Khail with C-Ring Road and the surrounding areas \u2013 TRN Routes): 1,645-meter micro-tunnel with pipe diameters ranging from 800mm to 1,000 mm \u2022 Location 4 \u2013 C160 (C-Ring Road near Old Airport Road \u2013 TRN Routes): 450 m of storage pipes with diameters ranging from 1,200 mm to 2,000mm \u2022 Location 5 \u2013 C145 (Al Wakra Area \u2013 TRN Routes): 3,750-meter pipeline with diameters ranging from 300 mm to 800 mm"},{"@type":"BreadcrumbList","@id":"https:\/\/www.ecgsa.com\/project\/critical-asset-resilience-program-carp-doha-south-area\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ecgsa.com\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.ecgsa.com\/project\/"},{"@type":"ListItem","position":3,"name":"Critical Asset Resilience Program (CARP) – Doha South Area"}]},{"@type":"WebSite","@id":"https:\/\/www.ecgsa.com\/#website","url":"https:\/\/www.ecgsa.com\/","name":"ECG website","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ecgsa.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/14510"}],"collection":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":1,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/14510\/revisions"}],"predecessor-version":[{"id":14513,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/14510\/revisions\/14513"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media\/14512"}],"wp:attachment":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media?parent=14510"}],"wp:term":[{"taxonomy":"activity","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/activity?post=14510"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/country?post=14510"},{"taxonomy":"scope","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/scope?post=14510"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/sector?post=14510"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}