{"id":14519,"date":"2024-07-10T11:23:33","date_gmt":"2024-07-10T11:23:33","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=14519"},"modified":"2024-07-10T11:23:33","modified_gmt":"2024-07-10T11:23:33","slug":"roads-and-infrastructure-in-south-of-al-meshaf-package-01","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/roads-and-infrastructure-in-south-of-al-meshaf-package-01\/","title":{"rendered":"Roads and Infrastructure in South of Al Meshaf -Package 01"},"content":{"rendered":"
Located 5 km west of Al-Wakrah, the project area of Al-Wukair straddles Al-Wukair Street. The QS049 project (3 contracts) serves a predominantly residential community spreading over an area of 2,300 ha; as a part of Zone 91 masterplan. It includes approximately 9,726 residential plots, 1,600 commercial plots, 4 schools, 3 reserved government plots, 21 mosques, 13 parks and 226 open space \/ green areas.
\nSouth of Al-Meshaf (Package 01) covers an area of 117 ha and encompasses a 6 km trunk main with diameters ranging from 2000 mm to 2400 mm along Al-Wukair Street.
\nThe scope of works includes:
\n\u2022\tComplete design of Foul Sewer Network for Zone-1 and Zone-2
\n\u2022\tComplete design of Foul Water Tunnel with associated shafts
\n\u2022\tHydraulic model (INFO-works ICM)\/design calculations
\n\u2022\tUtility clash analysis
\n\u2022\tAuthority design review approvals (QDRS)
\n\u2022\tStructural design of temporary\/ permanent micro-tunneling shafts
\n\u2022\tGeotechnical review for evaluation of sub-surface conditions and determination of design parameters
\n\u2022\tSlope Stability Analyses
\n\u2022\tProposed Dewatering Lagoon<\/p>\n","protected":false},"featured_media":14521,"template":"","activity":[1017,1018,1016,1015,1019],"country":[149],"scope":[],"sector":[256,262],"yoast_head":"\n