{"id":14566,"date":"2024-07-31T12:01:32","date_gmt":"2024-07-31T12:01:32","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=14566"},"modified":"2024-08-11T07:51:11","modified_gmt":"2024-08-11T07:51:11","slug":"400-kv-al-faw-substation-and-ohtl","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/400-kv-al-faw-substation-and-ohtl\/","title":{"rendered":"400 KV Al-Faw Substation and OHTL"},"content":{"rendered":"
The project (Al-Faw substation 400\/132\/11 KV) comprises the following:
\n1.\t400 KV substation consisting of five bays of breaker-and-half configuration to make ten feeders; six for the overhead transmission lines and four for the 4 Auto-Transformers 400\/132\/11 KV, each with a capacity of 250 MVA (total capacity of 1,000 MVA).
\n\u2022\tPhase Power Transformer Model: TL 1950 C
\n\u2022\tYear: 2014
\n\u2022\tStandard: IEC 60076
\n\u2022\tType of Oil: Ergon Hyvolt I
\n\u2022\tRated Frequency: 50 Hz.
\n\u2022\tMethod of Cooling: ONAF
\n\u2022\tTemp Rise of Oil Max: 50K
\n\u2022\tTemp Rise of Average Winding: 55 K
\n\u2022\tAmbient Temperature Max: 50 Degree
\n\u2022\tHot Spot: 68 K
\n\u2022\tVector Group Single Phase I A0 I0
\n\u2022\tVector group three phase YN A0 D11
\n2.\tFour Auxiliary Transformers 400 KVA-11\/0.4 KV (Type: OCREV, Made in Italy, 1000 KVA, Frequency: 50 Hz., Year: 2019, Voltage: 11 \/ 0.4 KV, Vector Group: Dyn11)
\n\u2022\tEquipment of the substation (400KV, 132 KV, G.I.B.) are of G.I.S. type
\n\u2022\tEquipment brand type is GE \u201cAlstom\u201d
\n\u2022\tProtection equipment brand type is \u201cMicom\u201d France<\/p>\n
3.\tElectricity Project for the Gulf connection of the section in Iraq.
\n\u2022\tIt consists of two parts:
\nFirst Part:
\no\tExtending, wiring, and installing 400 KV towers for a double line.
\no\tIt starts from Safwan area in Basrah and ends in Al-Faw 400 KV Substation in south of Basra next to the Arabian Gulf.
\no\tThe line (87 Km long) consists of 225 towers and only 27 tower foundations have been implemented so far.
\no\tThis line enhances the electrical capacity with 500 MW.<\/p>\n
Second Part in Al-Faw 400KV Substation
\no\tInstalling two reactors and their accessories of CVT, CT, SA, GIB, as well as other systems of protection, control devices, and wiring AC, DC cables. The aim of installing reactors is to improve the power factor, as long power lines result in voltage increase which changes the power rates.<\/p>\n","protected":false},"featured_media":14568,"template":"","activity":[558],"country":[180],"scope":[],"sector":[252,254],"yoast_head":"\n