{"id":14622,"date":"2024-08-14T10:04:22","date_gmt":"2024-08-14T10:04:22","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=14622"},"modified":"2024-08-14T10:04:22","modified_gmt":"2024-08-14T10:04:22","slug":"water-supply-and-sanitation-works-in-dowa","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/water-supply-and-sanitation-works-in-dowa\/","title":{"rendered":"Water Supply and Sanitation Works in Dowa"},"content":{"rendered":"
The project is funded by Arab Bank for Economic Development in Africa (BADEA) and the OPEC Fund for International Development. It comprises water transmission and distribution lines with a total length of 40 km, in addition to a water treatment plant with a capacity of 700 m3\/h. This adds to ancillary buildings including laboratory, administration building, pumping stations, staff house, store, guard house, generators etc…
\nDesign works include the intake, raw water gravity main from the intake to the water treatment plant (WTP), and the conventional water treatment works which comprises flocculation tanks, sedimentation tanks, rapid gravity sand filters and clear water pumping station, in addition to concrete service tanks, transmission lines and force-mains.
\nECG scope of work encompasses updating the design documents and drawings and preparing technical specifications and bill of quantities. <\/p>\n","protected":false},"featured_media":14624,"template":"","activity":[567,621],"country":[212],"scope":[],"sector":[256,259],"yoast_head":"\n