{"id":14754,"date":"2024-10-20T11:31:51","date_gmt":"2024-10-20T11:31:51","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=14754"},"modified":"2024-10-20T11:31:51","modified_gmt":"2024-10-20T11:31:51","slug":"bernis-airport","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/bernis-airport\/","title":{"rendered":"Bernis Airport"},"content":{"rendered":"
The project involves the development of the original plans for Bernis Airport’s terminal building, which consists of a ground floor and a mezzanine, with a total built-up area of 8,500 m2 and total capacity of 1.2m passenger\/year. The overall airport works include the construction of 39 buildings and facilities, totaling 21,980 m2 of built-up area, along with associated infrastructure and landscape works.
\nInfrastructure works encompass a potable water network (average pipe length: 5,300 m; diameter: 110 mm), a firefighting network (average pipe length: 6,100 m; pipe diameters ranging from 160 to 315 mm), an irrigation water supply sourced from the treatment plant (average pipe length: 4,000 m; diameter: 160 mm), and combined sewage and stormwater networks (average pipe length: 3,250 m; diameter: 200 mm).<\/p>\n","protected":false},"featured_media":14756,"template":"","activity":[556,939,558,568,563],"country":[71],"scope":[],"sector":[266,263],"yoast_head":"\n