{"id":3798,"date":"2017-03-16T17:05:48","date_gmt":"2019-12-10T11:48:59","guid":{"rendered":"https:\/\/ecgsa.com\/?project=smart-village-central-chiller-plant"},"modified":"2020-02-12T14:40:48","modified_gmt":"2020-02-12T14:40:48","slug":"smart-village-central-chiller-plant","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/smart-village-central-chiller-plant\/","title":{"rendered":"Smart Village Central Chiller Plant"},"content":{"rendered":"
The Smart Villages Company supplies the Smart Village buildings with a centralized air-conditioning and heating system provided through a central gas-fired HVAC plant built over several stages. The centralized heating and airconditioning system requires a plant for producing chilled and heated water in addition to a network for distributing such water to all buildings housed in the Smart Village and the Ministry of Communication Complex.<\/p>\n
With a built-up area of 12,000m2<\/sup>, the cooling station produces hot\/cold water & distributes it to the different buildings in Smart Village. The station is operated by BOO system. The station capacity is 24,000 cooling tons\/hr which is accomplished in 4 stages:
1st: 8,000 cooling tons\/ hr
2nd: 6,000 cooling tons\/ hr
3rd: 6,000 cooling tons\/ hr
4th: 4,000 cooling tons\/ hr<\/p>\n","protected":false},"featured_media":3799,"template":"","activity":[556,557,558,568,561,566],"country":[93,71],"scope":[640,641,637],"sector":[248,242],"yoast_head":"\n