{"id":4176,"date":"2017-03-22T11:43:33","date_gmt":"2019-12-10T11:52:39","guid":{"rendered":"https:\/\/ecgsa.com\/?project=extension-of-alexandria-chemicals-terminal-alx-ct"},"modified":"2020-02-12T14:40:44","modified_gmt":"2020-02-12T14:40:44","slug":"extension-of-alexandria-chemicals-terminal-alx-ct","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/extension-of-alexandria-chemicals-terminal-alx-ct\/","title":{"rendered":"Extension of Alexandria Chemicals Terminal (ALX-CT)"},"content":{"rendered":"
After concluding the design and construction supervision of Alexandria Chemicals Terminal (ALX-CT) in 2009, the Owner assigned ECG to start the design development for the “Extension” of the terminal located at El-Dekheila Port. The project’s aim was to increase the total storage Key project components comprised adding 13 chemical storage tanks of capacities ranging from 1,870 m3<\/sup> to 4,000 m3<\/sup>, two piggable pipelines each with a length of 550 m for the transfer of products from the jetty to the storage facilities, expansion of the truck loading station for bulk chemical land shipments; expansion of the nitrogen blanketing system for all chemical storage tanks; along with the expansion of all other service utilities including fire alarm, fire protection and compressed air systems.<\/p>\n","protected":false},"featured_media":4177,"template":"","activity":[556,567,557,558,564,565,561,572,577,562,566,573],"country":[82,71],"scope":[638,640,641,637],"sector":[242,245],"yoast_head":"\n
capacity from 26,000 m3<\/sup> to be 65,000 m3<\/sup> by the end of construction.<\/p>\n