{"id":4369,"date":"2017-04-06T17:48:44","date_gmt":"2019-12-10T11:59:01","guid":{"rendered":"https:\/\/ecgsa.com\/?project=al-rehab-shopping-centre-phase-5"},"modified":"2020-02-12T14:40:42","modified_gmt":"2020-02-12T14:40:42","slug":"al-rehab-shopping-centre-phase-5","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/al-rehab-shopping-centre-phase-5\/","title":{"rendered":"Al-Rehab Shopping Centre – Phase 5"},"content":{"rendered":"
The new shopping centre is located in Al Rehab City (phase 5 ) with a plot area of 25,087 m2<\/sup>, and a built-up area of 16,050 m2<\/sup>, surrounded by the intersection of 2 main roads; Othman Ibn Effan and Talaat Mostafa and The shopping centre comprises retail shops, fast food restaurants, restaurants located on multi storeys along with open terraces and shaded terraces, rentable office spaces, showroom, hypermarket, banks, service area and parking.<\/p>\n The main objective of the design is to reflect high technology, yet functional, energy saving and with the luxury of convenient maintenance. Careful concern is given for the elderly and handicapped. Entrances to the Service yards and roads are provided, distributed along the shopping center external facades to serve the retails, restaurants and food court, in addition to the main banks areas, show room and the super market. ECG used Revit BIM Package throughout the design process.<\/p>\n","protected":false},"featured_media":4370,"template":"","activity":[556,567,557,558,568,569,560,561,566,563],"country":[71,101,75],"scope":[638,645,637,649,646],"sector":[227,238],"yoast_head":"\n
wrapped by a secondary backwards street. The project is located in the centre of residential buildings and serves both residential phases number 4 and 5.<\/p>\n
site are positioned to provide convenient pedestrian access from the parking area around the shopping center.<\/p>\n