{"id":4477,"date":"2017-04-11T13:09:56","date_gmt":"2019-12-10T12:00:01","guid":{"rendered":"https:\/\/ecgsa.com\/?project=greater-cairo-waterworks-master-plan"},"modified":"2020-02-12T14:40:41","modified_gmt":"2020-02-12T14:40:41","slug":"greater-cairo-waterworks-master-plan","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/greater-cairo-waterworks-master-plan\/","title":{"rendered":"Greater Cairo Waterworks Master Plan"},"content":{"rendered":"

The objective of the project is to develop a Master Plan for the phased development of the Greater Cairo waterworks from 1977 through the year 2000.
The Master Plan covered domestic, industrial and irrigation needs of the served areas up to the year 2000, when the population was expected to grow from the present level of over 8 million to about 16 million inhabitants. Accordingly, the consumption was expected to increase from the present level of 2 millions m3 \/day to 8 millions m3 \/day. The study also included the development of high priority projects to be implemented immediately as remedial measures to improve the present conditions in areas not adequately served by the existing systems. This system consisted of about 2,500 km of mains and branch lines, and several water treatment
plants and pumping stations. The area of the project was largely extended since it covered all suburbs from Helwan in the South to Heliopolis and ElAbour in the North as well as the towns of Giza and Shoubra ElKheima.
The Greater Cairo Waterworks Master Plan study included the following:<\/p>\n