{"id":4498,"date":"2017-04-11T13:40:31","date_gmt":"2019-12-10T12:00:15","guid":{"rendered":"https:\/\/ecgsa.com\/?project=al-gabal-al-asfar-wastewater-treatment-plant-stage-ii-phase-ii"},"modified":"2020-02-12T14:40:41","modified_gmt":"2020-02-12T14:40:41","slug":"al-gabal-al-asfar-wastewater-treatment-plant-stage-ii-phase-ii","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/al-gabal-al-asfar-wastewater-treatment-plant-stage-ii-phase-ii\/","title":{"rendered":"Al-Gabal Al-Asfar WasteWater Treatment Plant (Stage II-Phase II)"},"content":{"rendered":"
The treatment plant is located in the northeast of Cairo. It receives wastewater from Cairo City via culverts and pumping stations forming a wastewater conveyance system. Following treatment, the final chlorinated effluent is discharged into Al-Gabal Al-Asfar Drain, and the
thickened sludge is dewatered before disposal.<\/p>\n
The existing Al-Gabal Al-Asfar Wastewater Treatment Plant involves two stages, each consisting of two phases. Stage I (under operation) is designed to provide treatment for an average raw wastewater inflow of one million square meters per day.<\/p>\n
Stage II is constructed in two phases and has been designed to handle an average raw sewage inflow of one million square meters per day. Phase I of Stage II is currently under operation with a capacity of 500,000 m3<\/sup> \/ day.<\/p>\n Phase II of Stage II consists of the following processes:<\/p>\n ECG’s scope of work encompasses the design of Phase II of Stage II, with a capacity of 500,000 m3<\/sup> \/day.<\/p>\n","protected":false},"featured_media":4499,"template":"","activity":[556,567,557,558,568,560,561,566],"country":[78,72,71],"scope":[645,637,657],"sector":[256,261],"yoast_head":"\n\n