{"id":4637,"date":"2017-04-12T11:38:50","date_gmt":"2019-12-10T12:01:40","guid":{"rendered":"https:\/\/ecgsa.com\/?project=upgrades-at-al-shamal-ptp-site"},"modified":"2020-02-12T14:40:40","modified_gmt":"2020-02-12T14:40:40","slug":"upgrades-at-al-shamal-ptp-site","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/upgrades-at-al-shamal-ptp-site\/","title":{"rendered":"Upgrades at Al-Shamal PTP Site"},"content":{"rendered":"

The existing Al-Shamal Package Treatment Plant (PTP) has two Sequencing Batch Reactor (SBR) streams; each designed for 75 m3\/day (out of ECG scope). There is no preliminary treatment in the existing PTP, the process is based only on a biological treatment followed by a secondary treatment.<\/p>\n

The existing treatment process used in the PTP is as follows:<\/p>\n