{"id":4874,"date":"2017-04-19T11:24:59","date_gmt":"2019-12-10T12:04:13","guid":{"rendered":"https:\/\/ecgsa.com\/?project=cairo-festival-city-66-22-kv-substation"},"modified":"2020-02-12T14:40:38","modified_gmt":"2020-02-12T14:40:38","slug":"cairo-festival-city-66-22-kv-substation","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/cairo-festival-city-66-22-kv-substation\/","title":{"rendered":"Cairo Festival City 66\/22 KV Substation"},"content":{"rendered":"

The project comprised the design, construction supervision, commissioning and handover of a 66\/22 kv electrical substation and its connection cables with the external main grid to feed the Cairo Festival City (CFC) project.<\/p>\n

The 66\/22 kv substation is part of the site wide infrastructure and associated projects for Cairo Festival City located at the 5th<\/sup> Conglomerate in New Cairo.The said substation is interconnected with New Cairo Station, 12 km apart throughout 630 mm2<\/sup> cables (route no.1) and with Zahraa Madinet Nasr-Police Academy Station, 3.5 km apart throughout 400 mm2<\/sup> cables (route no.2).<\/p>\n

The CFC Substation is built on an area of 3,042 m2<\/sup>, and consists of five buildings as follows:<\/p>\n