{"id":4940,"date":"2017-04-20T11:19:04","date_gmt":"2019-12-10T12:04:56","guid":{"rendered":"https:\/\/ecgsa.com\/?project=marsa-alam-power-plant"},"modified":"2020-02-12T14:40:37","modified_gmt":"2020-02-12T14:40:37","slug":"marsa-alam-power-plant","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/marsa-alam-power-plant\/","title":{"rendered":"Marsa Alam Power Plant"},"content":{"rendered":"
ECG was mandated the engineering services for phases I and II of the Marsa Alam Power Plant which housed dual fuel diesel generators with a total power generation capacity of 30 MW. In undertaking phase I of the power plant, ECG supervised the construction of ancillary buildings such as tank farms, water and fuel treatment plants, an administration building, and a guard house.In phase II, ECG prepared detailed architectural, structural, and piping designs for tanks as well as fire detection and protection, electrical, and instrumentation and control systems.<\/p>\n
<\/p>\n","protected":false},"featured_media":4941,"template":"","activity":[556,557,558,568,561,566],"country":[71],"scope":[682,641,637,676],"sector":[252,253],"yoast_head":"\n