{"id":7771,"date":"2020-09-20T14:10:46","date_gmt":"2020-09-20T14:10:46","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=7771"},"modified":"2020-09-20T14:17:15","modified_gmt":"2020-09-20T14:17:15","slug":"al-najaf-airport","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/","title":{"rendered":"Al Najaf Airport"},"content":{"rendered":"

Engineering Consultants Group worked on this project in a joint venture with Euroconsult, which involved reviewing preliminary design (PD) documents and preparing final designs and tender documents for the following components:<\/p>\n

\u2022 Pavements and visual aids for the new Runway 09-27.
\n\u2022 Airfield lighting and electrical enabling works.
\n\u2022 Electrical diversion works.
\n\u2022 Airfield lighting systems for the new Runway 09-27 and associated taxiways, including related civil and power supply installations.
\n\u2022 Airfield lighting substations.
\n\u2022 LV power supply to non-visual navigational aids.
\n\u2022 Street lighting network for the airport\u2019s perimeter roads.
\n\u2022 Telecom and ELV infrastructure and connection with existing systems at the project limit of work.
\n\u2022 NAVAIDS and MET equipment for Runways 09-27, 10-28.
\n\u2022 Drainage, including designing the structures (5 culverts) between the runways and the pond, as well as a sleeve for crossing the taxiway, and a 2-box culvert for crossing the main runway leading to the pond.
\n\u2022 Sleeves for the firefighting system crossing the new runway and taxiways.<\/p>\n","protected":false},"featured_media":7775,"template":"","activity":[557,558,559,857],"country":[180,859],"scope":[854,637,649,646],"sector":[266,263],"yoast_head":"\nAl Najaf Airport - ECG website<\/title>\n<meta name=\"description\" content=\"Engineering Consultants Group worked on this project ina joint venture with Euroconsult, which involved reviewingpreliminary design (PD) documents and preparingfinal designs and tender documents.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Al Najaf Airport - ECG website\" \/>\n<meta property=\"og:description\" content=\"Engineering Consultants Group worked on this project ina joint venture with Euroconsult, which involved reviewingpreliminary design (PD) documents and preparingfinal designs and tender documents.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/\" \/>\n<meta property=\"og:site_name\" content=\"ECG website\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-20T14:17:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600610239_182_385623_2645alnajafairportgeneralairfieldlayoutiraq.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1100\" \/>\n\t<meta property=\"og:image:height\" content=\"594\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/\",\"url\":\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/\",\"name\":\"Al Najaf Airport - ECG website\",\"isPartOf\":{\"@id\":\"https:\/\/www.ecgsa.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600610239_182_385623_2645alnajafairportgeneralairfieldlayoutiraq.jpg\",\"datePublished\":\"2020-09-20T14:10:46+00:00\",\"dateModified\":\"2020-09-20T14:17:15+00:00\",\"description\":\"Engineering Consultants Group worked on this project ina joint venture with Euroconsult, which involved reviewingpreliminary design (PD) documents and preparingfinal designs and tender documents.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#primaryimage\",\"url\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600610239_182_385623_2645alnajafairportgeneralairfieldlayoutiraq.jpg\",\"contentUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600610239_182_385623_2645alnajafairportgeneralairfieldlayoutiraq.jpg\",\"width\":1100,\"height\":594,\"caption\":\"Engineering Consultants Group worked on this project in a joint venture with Euroconsult.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ecgsa.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.ecgsa.com\/project\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Al Najaf Airport\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ecgsa.com\/#website\",\"url\":\"https:\/\/www.ecgsa.com\/\",\"name\":\"ECG website\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ecgsa.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n","yoast_head_json":{"title":"Al Najaf Airport - ECG website","description":"Engineering Consultants Group worked on this project ina joint venture with Euroconsult, which involved reviewingpreliminary design (PD) documents and preparingfinal designs and tender documents.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/","og_locale":"en_US","og_type":"article","og_title":"Al Najaf Airport - ECG website","og_description":"Engineering Consultants Group worked on this project ina joint venture with Euroconsult, which involved reviewingpreliminary design (PD) documents and preparingfinal designs and tender documents.","og_url":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/","og_site_name":"ECG website","article_modified_time":"2020-09-20T14:17:15+00:00","og_image":[{"width":1100,"height":594,"url":"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600610239_182_385623_2645alnajafairportgeneralairfieldlayoutiraq.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/","url":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/","name":"Al Najaf Airport - ECG website","isPartOf":{"@id":"https:\/\/www.ecgsa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#primaryimage"},"image":{"@id":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600610239_182_385623_2645alnajafairportgeneralairfieldlayoutiraq.jpg","datePublished":"2020-09-20T14:10:46+00:00","dateModified":"2020-09-20T14:17:15+00:00","description":"Engineering Consultants Group worked on this project ina joint venture with Euroconsult, which involved reviewingpreliminary design (PD) documents and preparingfinal designs and tender documents.","breadcrumb":{"@id":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#primaryimage","url":"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600610239_182_385623_2645alnajafairportgeneralairfieldlayoutiraq.jpg","contentUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600610239_182_385623_2645alnajafairportgeneralairfieldlayoutiraq.jpg","width":1100,"height":594,"caption":"Engineering Consultants Group worked on this project in a joint venture with Euroconsult."},{"@type":"BreadcrumbList","@id":"https:\/\/www.ecgsa.com\/project\/al-najaf-airport\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ecgsa.com\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.ecgsa.com\/project\/"},{"@type":"ListItem","position":3,"name":"Al Najaf Airport"}]},{"@type":"WebSite","@id":"https:\/\/www.ecgsa.com\/#website","url":"https:\/\/www.ecgsa.com\/","name":"ECG website","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ecgsa.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/7771"}],"collection":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":0,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/7771\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media\/7775"}],"wp:attachment":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media?parent=7771"}],"wp:term":[{"taxonomy":"activity","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/activity?post=7771"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/country?post=7771"},{"taxonomy":"scope","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/scope?post=7771"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/sector?post=7771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}