{"id":7803,"date":"2020-09-24T12:02:26","date_gmt":"2020-09-24T12:02:26","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=7803"},"modified":"2020-09-27T14:31:33","modified_gmt":"2020-09-27T14:31:33","slug":"flood-prevention-scheme-for-doha-north-area-phase-3-c1-850","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/","title":{"rendered":"Flood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850)"},"content":{"rendered":"

The project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works. The main components of the network are as follows: semi-perforated pipes with porous trench of diameters ranging from 300 mm to 600 mm, and length of approximately 35,350 m; solid pipes with diameters ranging from 300 mm to 800 mm, and length of approximately 32,250 m; and trench soakaway with length of approximately 4,830 m. The project also includes a pump station, an Emergency Flooding Area (EFA), and another EFA with pump station.<\/p>\n","protected":false},"featured_media":7809,"template":"","activity":[556,567,557,558,606,561,562,566],"country":[149],"scope":[637,860,657],"sector":[861,256],"yoast_head":"\nFlood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850) - ECG website<\/title>\n<meta name=\"description\" content=\"The project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Flood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850) - ECG website\" \/>\n<meta property=\"og:description\" content=\"The project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/\" \/>\n<meta property=\"og:site_name\" content=\"ECG website\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-27T14:31:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600947648_354_600081_2849floodpreventionschemefordohanorthareasphase3c1850_qatar-scaled-e1600947914945.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1683\" \/>\n\t<meta property=\"og:image:height\" content=\"1241\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/\",\"url\":\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/\",\"name\":\"Flood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850) - ECG website\",\"isPartOf\":{\"@id\":\"https:\/\/www.ecgsa.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600947648_354_600081_2849floodpreventionschemefordohanorthareasphase3c1850_qatar-scaled-e1600947914945.jpg\",\"datePublished\":\"2020-09-24T12:02:26+00:00\",\"dateModified\":\"2020-09-27T14:31:33+00:00\",\"description\":\"The project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#primaryimage\",\"url\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600947648_354_600081_2849floodpreventionschemefordohanorthareasphase3c1850_qatar-scaled-e1600947914945.jpg\",\"contentUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600947648_354_600081_2849floodpreventionschemefordohanorthareasphase3c1850_qatar-scaled-e1600947914945.jpg\",\"width\":1683,\"height\":1241,\"caption\":\"The flood prevention scheme project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ecgsa.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.ecgsa.com\/project\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Flood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ecgsa.com\/#website\",\"url\":\"https:\/\/www.ecgsa.com\/\",\"name\":\"ECG website\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ecgsa.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n","yoast_head_json":{"title":"Flood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850) - ECG website","description":"The project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/","og_locale":"en_US","og_type":"article","og_title":"Flood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850) - ECG website","og_description":"The project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works.","og_url":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/","og_site_name":"ECG website","article_modified_time":"2020-09-27T14:31:33+00:00","og_image":[{"width":1683,"height":1241,"url":"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600947648_354_600081_2849floodpreventionschemefordohanorthareasphase3c1850_qatar-scaled-e1600947914945.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/","url":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/","name":"Flood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850) - ECG website","isPartOf":{"@id":"https:\/\/www.ecgsa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#primaryimage"},"image":{"@id":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600947648_354_600081_2849floodpreventionschemefordohanorthareasphase3c1850_qatar-scaled-e1600947914945.jpg","datePublished":"2020-09-24T12:02:26+00:00","dateModified":"2020-09-27T14:31:33+00:00","description":"The project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works.","breadcrumb":{"@id":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#primaryimage","url":"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600947648_354_600081_2849floodpreventionschemefordohanorthareasphase3c1850_qatar-scaled-e1600947914945.jpg","contentUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2020\/09\/1600947648_354_600081_2849floodpreventionschemefordohanorthareasphase3c1850_qatar-scaled-e1600947914945.jpg","width":1683,"height":1241,"caption":"The flood prevention scheme project covers different areas of Muaither, Old Rayyan, Al-Gharafa, Al-Dafna, Bin Omran, Oniaza, Al-Tarfa, and Al-Khisah."},{"@type":"BreadcrumbList","@id":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-for-doha-north-area-phase-3-c1-850\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ecgsa.com\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.ecgsa.com\/project\/"},{"@type":"ListItem","position":3,"name":"Flood Prevention Scheme For Doha North Area \u2013 Phase 3 (C1\/850)"}]},{"@type":"WebSite","@id":"https:\/\/www.ecgsa.com\/#website","url":"https:\/\/www.ecgsa.com\/","name":"ECG website","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ecgsa.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/7803"}],"collection":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":0,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/7803\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media\/7809"}],"wp:attachment":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media?parent=7803"}],"wp:term":[{"taxonomy":"activity","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/activity?post=7803"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/country?post=7803"},{"taxonomy":"scope","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/scope?post=7803"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/sector?post=7803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}