{"id":7826,"date":"2020-09-28T11:16:03","date_gmt":"2020-09-28T11:16:03","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=7826"},"modified":"2020-11-17T10:12:48","modified_gmt":"2020-11-17T10:12:48","slug":"flood-prevention-scheme-fps-phase3-for-doha-south-areas-c2-850-flood-prevention","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/flood-prevention-scheme-fps-phase3-for-doha-south-areas-c2-850-flood-prevention\/","title":{"rendered":"Flood Prevention Scheme (FPS-Phase3) for Doha South Areas (C2\/850) Flood Prevention"},"content":{"rendered":"
The project covers the design services of Flood Prevention Scheme (FPS-Phase3) for Doha South Areas (C2\/850), including Mamoura, Abu Sidra & Al-Mearad, Old Airport & Nuaija, Ain Khalid and Al-Wakra. Works include hydraulic, civil, and structural design for a storm water network; including pipes, hydraulic structures, diversions, and other under or above ground works. The main components of the network are as follows: semi-perforated pipes with porous trench of diameters ranging from 300 mm to 1,000 mm, and length of approximately 50,220 m; solid pipes with diameters ranging from 400 mm to 1,200 mm, and length of approximately 12,091 m; and trench soakaway with length of approximately 250 m. The project also includes a pump station, an Emergency Flooding Area (EFA), and underground tanks.<\/p>\n","protected":false},"featured_media":7828,"template":"","activity":[556,567,557,558,606,561,566],"country":[149],"scope":[637,860,657],"sector":[861,256],"yoast_head":"\n