{"id":8160,"date":"2021-09-29T11:34:18","date_gmt":"2021-09-29T11:34:18","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=8160"},"modified":"2021-09-29T11:34:18","modified_gmt":"2021-09-29T11:34:18","slug":"sheikh-zayed-city-extension-2","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/sheikh-zayed-city-extension-2\/","title":{"rendered":"Sheikh Zayed City Extension"},"content":{"rendered":"
The project covers the strategic plan and development strategy of Sheikh Zayed City Extension, including an area of 1,850 acres for a preparatory phase covering top-priority segments of the extension.<\/p>\n
ECG scope of work comprises preparing detailed design for the following:<\/p>\n
The main electrical power network with total loads of approximately 681 MVA. These loads are fed by the main HV substation through 53 electrical distributers.<\/p>\n