{"id":8219,"date":"2021-11-24T10:56:43","date_gmt":"2021-11-24T10:56:43","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=8219"},"modified":"2021-11-24T10:56:43","modified_gmt":"2021-11-24T10:56:43","slug":"ten-bridges-and-retaining-walls-in-kuwait-international-airport","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/ten-bridges-and-retaining-walls-in-kuwait-international-airport\/","title":{"rendered":"Ten Bridges and Retaining Walls in Kuwait International Airport"},"content":{"rendered":"

The project comprises ten post-tensioned box girder bridges with a length that varies from 70 m to 250 m, and free spans of approximately 60 m.<\/p>\n

ECG role is to review the structural design and issue structural integrity report based on the design drawings provided by the client for the bridges (1A, 1B, 2A, 2B, 3, 4, SA, SB, SC, and SD) and retaining walls (1A, 2A, 3A, 4A, 6A, 1B, 2B, 3B, 48, and 6B).<\/p>\n

ECG structural scope of work includes reviewing and validating the following:<\/p>\n