{"id":8298,"date":"2022-01-11T12:49:29","date_gmt":"2022-01-11T12:49:29","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=8298"},"modified":"2022-02-20T12:12:56","modified_gmt":"2022-02-20T12:12:56","slug":"madinah-gate-project","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/","title":{"rendered":"Madinah Gate Project"},"content":{"rendered":"

Developed in the interconnection of three land plots (E16-1A , E17-1, and E17-2) with a total land area of 20,665 m2<\/sup>; the project includes the construction of the first Transit-Oriented Development in the Kingdom which includes a four-star hotel, hotel apartments, retail areas, shops, and restaurants; as well as an entertainment area and a bus station that is directly connected to the train station.<\/p>\n

Plot E16-1A<\/strong><\/p>\n

The plot is connected directly to the train station from a side and plot E17-1 from the other side, through an intermediate bridging that comprises an intermediate entrance hall with double height atrium in the ground floor and bridges with some retail areas in first floor.<\/p>\n

The ground floor also includes a bus terminal, waiting area, car rental facility, souvenir shops, and cafes; while the first floor consists of a health club, medical clinics, food & beverage stores, and cafes.<\/p>\n

Plot E17-1<\/strong><\/p>\n

The ground floor includes retail areas, supermarket, pharmacy, restaurants, and cafes; the first floors encompasses retail area, international food court (BUA: 21,991 m2<\/sup>), entertainment center, and home furniture & book stores; and the second floor consists of a family entertainment and bowling centers, and approximately 39 restaurants and cafes. In addition, A 4-star hotel occupies the floors from the third up to twentieth, with an estimated BUA of about 23,000 m2<\/sup>.<\/p>\n

Plot E17-2 <\/strong><\/p>\n

The plot includes a proposed surface parking in the vicinity of plot E17-1, with a welcoming plaza for the southern entry point in the future expansion.<\/p>\n

The plots are served by a two-level basement that is allocated for car parking, with an estimated total area of about 29,055 m2<\/sup> and total BUA of 88,645 m2<\/sup>, including 800 parking spaces and service facilities.<\/p>\n","protected":false},"featured_media":8311,"template":"","activity":[556,567,557,558,568,569,560,561,562,566,563],"country":[172,171],"scope":[642],"sector":[268,269],"yoast_head":"\nMadinah Gate Project - ECG website<\/title>\n<meta name=\"description\" content=\"Developed in the interconnection of three land plots (E16-1A , E17-1, and E17-2) with a total land area of 20,665 m2; the project includes the construction of the first Transit-Oriented Development in the Kingdom which includes a four-star hotel, hotel apartments, retail areas, shops, and restaurants; as well as an entertainment area and a bus station that is directly connected to the train station.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Madinah Gate Project - ECG website\" \/>\n<meta property=\"og:description\" content=\"Developed in the interconnection of three land plots (E16-1A , E17-1, and E17-2) with a total land area of 20,665 m2; the project includes the construction of the first Transit-Oriented Development in the Kingdom which includes a four-star hotel, hotel apartments, retail areas, shops, and restaurants; as well as an entertainment area and a bus station that is directly connected to the train station.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/\" \/>\n<meta property=\"og:site_name\" content=\"ECG website\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-20T12:12:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ecgsa.com\/app\/uploads\/2022\/01\/1641905124_465_185589_2828_madinahgateproject1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1100\" \/>\n\t<meta property=\"og:image:height\" content=\"520\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/\",\"url\":\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/\",\"name\":\"Madinah Gate Project - ECG website\",\"isPartOf\":{\"@id\":\"https:\/\/www.ecgsa.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2022\/01\/1641905124_465_185589_2828_madinahgateproject1.jpg\",\"datePublished\":\"2022-01-11T12:49:29+00:00\",\"dateModified\":\"2022-02-20T12:12:56+00:00\",\"description\":\"Developed in the interconnection of three land plots (E16-1A , E17-1, and E17-2) with a total land area of 20,665 m2; the project includes the construction of the first Transit-Oriented Development in the Kingdom which includes a four-star hotel, hotel apartments, retail areas, shops, and restaurants; as well as an entertainment area and a bus station that is directly connected to the train station.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#primaryimage\",\"url\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2022\/01\/1641905124_465_185589_2828_madinahgateproject1.jpg\",\"contentUrl\":\"https:\/\/www.ecgsa.com\/app\/uploads\/2022\/01\/1641905124_465_185589_2828_madinahgateproject1.jpg\",\"width\":1100,\"height\":520,\"caption\":\"Occupying a land adjacent to Haramain High Speed Train Station in Madinah and an area overlooking Prince Nayef Road; the vision for the development is to integrate hospitality, retail, and transportation facilities and provide an iconic, attractive, and welcoming \u201cfront door\u201d. The project is a key integral element of KEC program, which is planned to be an exemplar in sustainable economic growth and diversification for other KSA Economic Cities and GCC Countries.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ecgsa.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.ecgsa.com\/project\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Madinah Gate Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ecgsa.com\/#website\",\"url\":\"https:\/\/www.ecgsa.com\/\",\"name\":\"ECG website\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ecgsa.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n","yoast_head_json":{"title":"Madinah Gate Project - ECG website","description":"Developed in the interconnection of three land plots (E16-1A , E17-1, and E17-2) with a total land area of 20,665 m2; the project includes the construction of the first Transit-Oriented Development in the Kingdom which includes a four-star hotel, hotel apartments, retail areas, shops, and restaurants; as well as an entertainment area and a bus station that is directly connected to the train station.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/","og_locale":"en_US","og_type":"article","og_title":"Madinah Gate Project - ECG website","og_description":"Developed in the interconnection of three land plots (E16-1A , E17-1, and E17-2) with a total land area of 20,665 m2; the project includes the construction of the first Transit-Oriented Development in the Kingdom which includes a four-star hotel, hotel apartments, retail areas, shops, and restaurants; as well as an entertainment area and a bus station that is directly connected to the train station.","og_url":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/","og_site_name":"ECG website","article_modified_time":"2022-02-20T12:12:56+00:00","og_image":[{"width":1100,"height":520,"url":"https:\/\/www.ecgsa.com\/app\/uploads\/2022\/01\/1641905124_465_185589_2828_madinahgateproject1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/","url":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/","name":"Madinah Gate Project - ECG website","isPartOf":{"@id":"https:\/\/www.ecgsa.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#primaryimage"},"image":{"@id":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2022\/01\/1641905124_465_185589_2828_madinahgateproject1.jpg","datePublished":"2022-01-11T12:49:29+00:00","dateModified":"2022-02-20T12:12:56+00:00","description":"Developed in the interconnection of three land plots (E16-1A , E17-1, and E17-2) with a total land area of 20,665 m2; the project includes the construction of the first Transit-Oriented Development in the Kingdom which includes a four-star hotel, hotel apartments, retail areas, shops, and restaurants; as well as an entertainment area and a bus station that is directly connected to the train station.","breadcrumb":{"@id":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#primaryimage","url":"https:\/\/www.ecgsa.com\/app\/uploads\/2022\/01\/1641905124_465_185589_2828_madinahgateproject1.jpg","contentUrl":"https:\/\/www.ecgsa.com\/app\/uploads\/2022\/01\/1641905124_465_185589_2828_madinahgateproject1.jpg","width":1100,"height":520,"caption":"Occupying a land adjacent to Haramain High Speed Train Station in Madinah and an area overlooking Prince Nayef Road; the vision for the development is to integrate hospitality, retail, and transportation facilities and provide an iconic, attractive, and welcoming \u201cfront door\u201d. The project is a key integral element of KEC program, which is planned to be an exemplar in sustainable economic growth and diversification for other KSA Economic Cities and GCC Countries."},{"@type":"BreadcrumbList","@id":"https:\/\/www.ecgsa.com\/project\/madinah-gate-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ecgsa.com\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.ecgsa.com\/project\/"},{"@type":"ListItem","position":3,"name":"Madinah Gate Project"}]},{"@type":"WebSite","@id":"https:\/\/www.ecgsa.com\/#website","url":"https:\/\/www.ecgsa.com\/","name":"ECG website","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ecgsa.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/8298"}],"collection":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":0,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/project\/8298\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media\/8311"}],"wp:attachment":[{"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/media?parent=8298"}],"wp:term":[{"taxonomy":"activity","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/activity?post=8298"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/country?post=8298"},{"taxonomy":"scope","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/scope?post=8298"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/www.ecgsa.com\/wp-json\/wp\/v2\/sector?post=8298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}