{"id":8593,"date":"2022-04-17T11:33:20","date_gmt":"2022-04-17T11:33:20","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=8593"},"modified":"2022-08-30T08:07:38","modified_gmt":"2022-08-30T08:07:38","slug":"al-murooj-golf-community-3-gc3","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/al-murooj-golf-community-3-gc3\/","title":{"rendered":"Al-Murooj Golf Community 3 (GC3)"},"content":{"rendered":"
Located within the overall master plan of King Abdullah Economic City (KAEC); GC3 project is an integrated residential community that accommodates 238 villa plots in addition to mosques, parks, infrastructure, roads, and public areas with a total built-up area 262,694 m2<\/sup>.<\/p>\n Infrastructure networks include potable water network with a length of 3.87 km and diameter of 110mm; irrigation network with a total length of 11.30 km and diameters of 160mm, 90mm, 75mm, 63mm, 50mm & 32mm; sewage network with a length of 6.7 km and diameters of 160mm & 200mm; storm network with a total length of 4.46 km and diameters of 200mm, 400mm, 500mm, 600mm, 700mm, 800mm & 1000mm.<\/p>\n Also, the electrical network comprises MV cables (3\u00d7300 mm) with length of 2.8 km and LV cables (4\u00d770mm, 4\u00d7120mm, 4\u00d7300mm, and 4\u00d716mm) with a length of 27.8 km; while the telecommunication network encompasses 12\u00d750mm HDPE conduit with a length of 4.45 km and 2\u00d720mm HDPE conduit with a length of 22.9 km.<\/p>\n","protected":false},"featured_media":8594,"template":"","activity":[567,557,558,561,562],"country":[171],"scope":[640,641,637,636,657,646],"sector":[268,269],"yoast_head":"\n