{"id":8598,"date":"2022-04-21T08:43:31","date_gmt":"2022-04-21T08:43:31","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=8598"},"modified":"2022-08-30T07:58:47","modified_gmt":"2022-08-30T07:58:47","slug":"two-sewage-pipelines-in-the-new-administrative-capital","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/two-sewage-pipelines-in-the-new-administrative-capital\/","title":{"rendered":"Two Sewage Pipelines in the New Administrative Capital"},"content":{"rendered":"
The project comprises two gravity concrete sewage pipelines with a diameter of 3400 mm, total length of 18 km for each pipeline, and 114 concrete manholes to serve The New Administrative Capital, Badr City, and areas of New Cairo.<\/p>\n","protected":false},"featured_media":8600,"template":"","activity":[559],"country":[71],"scope":[640,641],"sector":[256,262],"yoast_head":"\n