{"id":8890,"date":"2022-08-25T09:32:57","date_gmt":"2022-08-25T09:32:57","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=8890"},"modified":"2022-08-25T09:32:57","modified_gmt":"2022-08-25T09:32:57","slug":"military-academy-u-turn-bridge-and-access-road","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/military-academy-u-turn-bridge-and-access-road\/","title":{"rendered":"MILITARY ACADEMY U-TURN BRIDGE AND ACCESS ROAD"},"content":{"rendered":"
The project consists of U-turn bridge and access road for the Military Academy with a total length of approximately 72 m, including two simple spans each of 36 m. The bridge is composed of pre-stressed girders spaced approximately at 1.5 m.<\/p>\n
The engineering consultancy studies are carried out in close conformity with \u201cHighway Structures Design Manual” and the “AASHTO LRFD”. In addition, the load effects detailed in AASHTO LRFD (Latest Edition) are assumed by applying a 100\u2010year design with the associated durability as noted in these standards.<\/p>\n","protected":false},"featured_media":8893,"template":"","activity":[557,558,562,566],"country":[167],"scope":[915,916,914],"sector":[264,263],"yoast_head":"\n