{"id":9543,"date":"2022-12-21T10:45:51","date_gmt":"2022-12-21T10:45:51","guid":{"rendered":"https:\/\/www.ecgsa.com\/?post_type=project&p=9543"},"modified":"2022-12-21T10:45:51","modified_gmt":"2022-12-21T10:45:51","slug":"extension-and-upgrade-of-ghabbour-factory-in-al-sadat-city","status":"publish","type":"project","link":"https:\/\/www.ecgsa.com\/project\/extension-and-upgrade-of-ghabbour-factory-in-al-sadat-city\/","title":{"rendered":"Extension and Upgrade of Ghabbour Factory in Al-Sadat City"},"content":{"rendered":"
The project includes the construction of a new paint shop building with footprint area of 10,400 m2<\/sup>, new chemical storage building with footprint area of 400 m2<\/sup>, and new fueling station (Gasoline and Diesel).<\/p>\n In addition, several upgrades and extensions are made to the existing buildings; including the warehouse (footprint area of 10,480 m2<\/sup>), unboxing building (footprint area of 1,618 m2<\/sup>), body shop building (footprint area of 6,688 m2<\/sup>), assembly shop (footprint area of 8,400 m2<\/sup>), test shop (footprint area of 2,700 m2<\/sup>), and the administrative building (footprint area of 890 m2<\/sup>).<\/p>\n","protected":false},"featured_media":9548,"template":"","activity":[556,557,558,568,561,572,562,566],"country":[71],"scope":[638,637,649,650,646],"sector":[243,242],"yoast_head":"\n